Laserfiche WebLink
� <br /> � o <br /> �, O � <br /> T <br /> r � <br /> 1� � L <br /> u C <br /> e a <br /> y E a <br /> r"e u' a` z° <br /> C 3 � Construction and renovation can create conditions that can compromise the health <br /> and safety patients, staff, and visitors. Facility planning must include, in addition to <br /> space and operational needs, provisions for infection control and safety of the <br /> facility's occupants during any renovation or new conswction. The faciliry's <br /> infection control (ICP), safety, and securiry personnel (S&SP)should be involved <br /> with facility planning, design, construction,and commissioning of any new or <br /> renovated azea.The design professional should incorporate the specific wnstruction- <br /> related requircments of the ICP and S&SP in the contract documents. The contract <br /> documents should require the constructor ro implement these specific requirements <br /> during construction. WAC 246-320-265(1) WAC 246-320-405(1) <br /> Approved 9/05/2002 per sheet A-20.1 Spec section 1500(D) <br /> C 4 ❑O Fire safety during construction, alteration,or demolition must be provided as <br /> indicated in Article 87, Unifortn Fire Code. Indicate the exiting paths that will be <br /> available during cunstruction and how the construction will be separated from the <br /> existing facility as well ::s the materials used.The design professional shall <br /> incorporate the specific constructiomrelatcd requirements in the contract documents. <br /> The contract documents should require the constructor to implement lhese specific <br /> requirements during construction. Combustible materials are not pertnitted to be <br /> used as barriers. WAC 246-320-265(1) WAC 246-320-405(1) Section 1001.3 <br /> Unifomi Firc Code <br /> Approved. Sec Comment 1i2. <br /> C 4 ❑O Door shall swing in dircction of cgress, including temporary doors. <br /> Cross corridor door in corridor 107 will be removed prior to temporary wall <br /> installation. <br /> C 5 ❑x Provide a door, at the corcidor, for the control rootn. Eliminate the cross-corridor <br /> doors. <br /> Dcwr 112A was added to rnntrol room ll2. Recommend delete door 118A. <br /> C 6 O Provide for a one-hour corridor. <br /> This comment is void. <br /> C 7 O Provide waste gas evacuation when Nitrous is used. <br /> 1'Vastc gas is provided at MRI room q101. <br /> �J <br /> Pagc 4 of 7 Plan Review Comments for Project p 647� <br /> Necicw Kcy: A=Architect P=Pirc h Lile Sa(cry• S=Sanitarian M=Mechanical/Electrical C-Con(ercnce Note <br />