My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE 2018-01-01 MF Import
>
Address Records
>
PAINE AVE
>
3326
>
3326 PAINE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:43:58 AM
Creation date
2/25/2017 5:27:42 PM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. QEVELOPEd SITE CONDITIONS <br /> This development proposes to build 0.24 acres of new pavement and roof for parking and <br /> loading dock. The site area table below summarizes the prop�sed improvements. <br /> Site Areas <br /> Total On-site Bypass Off-site <br /> ac ac ac ac <br /> Area of DisturUance 026 0.22 0.04 0.04 <br /> Note: the bypass area above is also included in the on-site area. <br /> This is shown in the stormwater calculations in Appendix A. <br /> The development area lies west of Paine Ave and north, south and east of e;.isting <br /> industriallcommercial uses. The site has access off of Paine Ave and also borders the <br /> south end of an alley. Grades on this site are flat and run from east to west. The <br /> developed/disturbed portion of lhis project will be analyzed as an independent basin <br /> since no offsite flow other than those shown from tlie >.Iley and a portion oi the R.O.W. <br /> are collected by the proposed system. This site is located within ihe combined <br /> storm/sewer system basin for the City of Everett. Therefore, all of the proNosed <br /> impro�:ements will be connected to that system. Discharge from the loading dock and <br /> detention pipe will be conveyed directly to the existing sewer main u,rithin the Paine Ave <br /> P..O.W. <br /> Paved surfacec for this project will be collected and directed 10 the proposed detention <br /> pipe via catch basins and pipes. All of the downspouts from thc new roof will be splashed <br /> over the proposed pavement and wiil also be collected by the same system. <br /> 11-115 <br /> Glacier Properies page-7 <br /> December 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.