Laserfiche WebLink
9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. <br /> All vehicles working on and around the site would need to meet the State requirements <br /> for emissions. <br /> 10: Control DeWatering <br /> All dewatering runoff from this project will be directed to the detention pipe. This will <br /> clean the water and control the release to the downstream system. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the County to relocate or add BMPs as necessary as site <br /> conditions change. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the County Inspedor and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall he done by a person who is knowledgeable in the principles and <br /> practices of erosion a�d sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SVUPPP are inac'equale, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes <br /> shall be implemented as soon a:: nossible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SW!'PP shall be retained on-site or within reasonable access to the <br /> site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant <br /> efTect on the discharge of pollutants to waters of the state. <br /> The SWPPP shali be modified if, during inspections or investigations conducted by the <br /> ownerloperator, or the applicable local or state regulatory authority, it is determined that <br /> the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include <br /> additional or modified BMPs designed to correct problems identified. Revisions to the <br /> SWPPP shall be completed within seven days following inspection. <br /> Glacier Properlies 11'115 <br /> December 2011 Page-16 <br />