Laserfiche WebLink
f+,y!� `� <br /> COMPLIANCE NWEC LO`. AiSE RE�5IDENTIAL COh._ LIANCE CHECKLIST <br /> � AEGUIRED� Electricelly heated dweilings, s 3 storles, Zone 1, Western Washinyton <br /> • tNePecnoN �MPORTAN f: Plsas� supply Iniormatlon nqu0sted In the approprlate <br /> . APPROVED �hadea %soxes b�low. Disnpard box�s that don't desarlbe your butldiny or <br /> oqufp�nent. DQ_HD.I;lace cheeks In the two teft �columns. <br /> FINAL PHASE <br /> rawl ap�ce Floors wfll be insulated without compression, and with adequat suppoA to: <br /> O R30(Ch ri6 Option I) ❑ R19 (Ch 1f6 Options II, III, IV) � R�Ch#4, 5,or� <br /> Non•vaultod, ettic ceilinqs will be insulated without compression to: <br /> O R-38 (Ch�t6, all options) O R_(Ch k4,5,or 7) <br /> Intetlor Bolow p�ade walis are insulated without compression to R19 instead ol exterior R10. <br /> � Qoor systems meet: �U.19(Ch#6, (options I, II, III) �U.22(Ch#6, (option IV �U.�Ch#4 or S) <br /> looseflll Insulatlon OK H: <br /> t) maximum ceilinp siope not> 2 1/2 in 12 <br /> 2) x30"ot clear distance from top ot botlom chord to the underside oi rooi sheathing at the roo(ridge. <br /> 6 mll polyHhyl�ne or other approved ground cover lapped 72" at all joints and to foundalion wail <br /> Q Clearances meet listed minimums between insulat(on and: <br /> 1) chimney 2) Iight(ixtures 3) IC rated recossed lights (O"clearance OK) <br /> Aftic hatch is insulated to required ceiling R•value and is weatherstrippad. <br /> All exterlor andlor parape to home doorsareweatherstr�pped. <br /> R�circulatlny service hot water plpinq is insulat�d as checked below(see Uniform Building C�de, <br /> Sections 1712 81713, flame spread and smoke densfty requirements) <br /> 1) t-1/2" insulation for main lines in attic and crawispace. <br /> 2) 1"insulation tor branch Iines in attic and crawl space. <br /> Mlnlmum of one ihermostat per HVAC system with proper F range r,;55-75' (heating). <br /> Readtly accesslble means to resirict or shut•otf healing Input to each zone orfloor not <br /> cornrollod by a thermostat. <br /> Th�rmostet setback is in place and readily accessible.. <br /> Beckup heatlnp system controla must prohibit operation when primary heating system is <br /> operating. <br /> Mechanical venlilatlon system must have a means tor volume reduction and shut-otf. <br /> Supply ducta must have volume dampers to balance system. <br /> Supply and return ely ductwork is required to have sealed duct joints in unconditioned spaces <br /> and: �i11 insulation (Ch p5 and 6, all options) OR ❑ R_(Ch#4 Approach) <br /> Electric water heater(s) has : <br /> 1) separale power shut-off 3) ASHRAE 90A-80 label on tank <br /> 2) noncompressible R10 pad (unheated spaces only) <br /> Shower(s) has a means to limit flow to 2.75 gpm or less <br /> ,...... >�9.:,...---:ttt�,,,. .>, . ,. ,.;.: ... � :. . . . ....::.. .. ....: .�, ,�,_,..,,s , .. <br /> Flreptaces O wili � wlll not be Installed: Mir. Model <br /> Woodstoves � wlll wlll not be Installed: Mfr. ModelS <br /> II tlreptece/stove(s) h ve: 1)6 square inch combustion air supply directly conected to ihe tire box °, <br /> 2)Combustion air duct with readiiy accessible,tight tilting damper. 3) Tight titting glass or metal doors <br /> �... , , ;, ,>: , . ..: , <,.,,,:, ,,..,:< ,. <br /> , ,,. ., . .,,,u, .. . . ,,. , ,,: . . , . . <br /> Masonry flrepiace(s) has a tight fitting flue <br /> damperwith readily accessible, manual conlrol(s). <br /> NWEC Fina/ ph e re ulrements: <br /> Approved by:_�=s� <br /> Date �Z�`1 � <br /> WEE911PRILYO PeQO 7 Ot 7 <br />