My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 MERRILL CREEK PKY 2018-01-02 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1707
>
1707 MERRILL CREEK PKY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 3:47:38 PM
Creation date
2/25/2017 9:08:37 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1707
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ' Flow Control and Water Quallty Facilitl�: <br /> � Flow control and water qualiry design standards for the site are in accordance with the <br /> C'ity of Everett Sturm Water Management Manual (C6apter 3) dated January 1997. The <br /> ' Greens of Merrill l'reek project will be required to provide sour�ce contrul, stream bank <br /> erosion control and runoff tru^aunent, due to the creation of more than 5,000 square feet of <br /> impervious and pollution generating surfaces (Sce aCached table 1-1.1). <br /> IThe City of Everett StoRn Water Management Manual requires detendon to limit the <br /> peak developed dischazge rate for the 2-year, 24-hour storm event to not exceed 50% of <br /> the peak runoff rate for the 2-yeaz, 24-hour storm under the predevloped con3itions. In <br /> , addition, die peak developed runoff rates for the 10-yeaz and the 100-yeaz, 24hour <br /> design stonn events are not to exceed the peak tunoff r,ues for the 10-yeaz and 100-year <br /> I storms under ezisting site conditions. The Santa Barbzra Urban Hydrograph method is <br /> used to estimate runoff for the site. A cornxtion factor is required when SCS-type <br /> methods and the 24-hour storm durations are used to design streambank erosion <br /> ' measures. The correction factor increases the required detention volume to account for <br /> the effects of continual storm events. The correction factor to be used in the design of <br /> runoff control is determined frum Figure 1-3.1. See the attachei Figure 1-3.1. <br /> � Water quality will be achieved through the consuvction of a wetpond that will consist of <br /> a permanent pool volume equal to the volume of runoff from a 6-month, 24-hour design <br /> � storm. 7'he 6-month, 24 hour design storm is determined from the developed site <br /> conditions. The wetpond will be.composed of two cells, the open water cell and the <br /> wetland treatment cell. A maaimum of 85% of the permanent pool volume will be <br /> � associated with the open water cell which is to be loe:ated within the detention/wet vault. <br /> A minimum of 15% of the permanent pool volume must be associateci with the wedand <br /> treatment cell and must be vegeta[ed. T'he detention volume pive srorage) will be <br /> 1 combined with the wetpond open water cell volume (dead storage) in order�� reduce the <br /> � number of vaults necessary to contro] the site's stortn water. <br /> � The attached calculations used to size the detention and water quality facilities for the site <br /> show a required detention volume of 62,659 cubic feet with a toW of 62,816 cubic feet <br /> provided within the actual vault. The required volume for water quality is 20,270 cubic <br /> � feet. The maximum required volume in the wet vault is 17,229 cubic feet and the <br /> minimum required wetpond volume is 3,041 cubic feet, with 17,280 cubic feet located <br /> within the vault and 3,041 cubic feet within the wetpond. <br /> ' Seaway Lot 8, which is located to the south of Merrill Creek Pazkway, contributes off- <br /> site flows to the project site through an 18" conerete pipe. Seaway lot 8 consists of 35.45 <br /> ' acres and is located within two drainage basins, the Merrill and Ring Creek and <br /> Glenwood Creek drainage basins. The Merrill and Ring Creek drainage basin collects <br /> � 23.28 acres of flow and the Glenwuod Creek drainage basi� accounts for the other 12.17 <br /> acres of flow generated on the site. The Merrill and Ring Creek basin associated with <br /> Seaway lot 8 is conveyed through the project site while the runoff generated within <br /> IGlenwood Creek basin is conveyed elsewhere. According to W & H Pacific's <br /> ( 3 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.