My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—'—"—OCT.23.1997 10�05AM W8H PRCIFIC N0.944 P.2�6 <br /> I PACIFI� <br /> eaoss.w o��ooaa�zo <br /> seavenon. <br /> October 22, 1997 <br /> �,Wayne M. W�� <br /> Ciry of Everett Public Works Dept• <br /> 3200 Cedar Strcet <br /> Everett,Washington 95201 <br /> Dear WaYne, <br /> This letter is being prcpared on behalf of Quadrant Corporaricn and Solecuon, with regard to Lot <br /> 2F in SeawaY Center. Earlier this year,we prepared a mitigation fee calculation based on a set of <br /> assumptions which tho tenan��develo ment to nitimac Y�ludehtwo b ilding s b�used or <br /> property, and is plazuunS a P p <br /> - - administrarion,-assembly,-pa��o n�and_shipping of alecuonic equipment This letter presenu a <br /> revision to the initial trip 8�eration azid assessment of mitigation fees. <br /> Solectron operates as a contactor to various electronics com.pania, doing parts assembly. They <br /> anticipate a start-up emploYment of about 337 employees. DcpendinS on con�act volume and <br /> schedule needs of those c e o�ati� le el of about SSOemployees,a ei�th tYone or two buildings• <br /> They anticipate an aveng P B <br /> The maximum level of employces is aztticipated to be 1,200,woridng on 5 separate schedulcs,at e <br /> ultimate Phase 2 development. At�nhiWi111be increasod over deinirial levels, The folowaing ble <br /> be proposed and when employm <br /> piesenes the anticipated initial, average and mnximum staf�►ng levels for the faciliry,by shift. <br /> P�e 1 Phsse i-2 Phase 2 <br /> Initsl AverxBe Maaimum <br /> Fi�st Shift� <br /> •167 172 373 � <br /> ;�atn-3:30pm �C�o� 1 <br /> -,�� � 7G 165 ��r, �,pN <br /> � < econd Shift <br /> / j 6:00 6:30gm ,' V <br /> G� �C a"�' ' iao 3�o v � � <br /> r, � Thicd Shift 140 �,��� <br /> n� Q 3:45 pm-2:?0 am <br /> s- 62 135 / <br /> ,0 FouRh Shift � <br /> 1 (� 6:00 pm-6:30 a�n �� <br /> \ �� /J <br /> �-� � Officc i L <br /> 50 107 <br /> 7:00 am-4:00 pm 50 108 1� � �� � <br /> 8:00 am•5:00 pm <br /> 0 <br /> Total <br /> 307• 550 1198 <br /> • 30 addirioaal employees wotk n 3•day,36-hour weckmd sltift,6:00 em-6,30 pm <br /> (503)626-Oa55 Fu�(503)526•0775 Planning•Engineering•Surveying•Laadseape Archi[ee[ure � <br />
The URL can be used to link to this page
Your browser does not support the video tag.