My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- -"—OCT.23.1997 10�06AM W&H PRCIFIC N0.944 P.3i6 I <br /> Ivfr.Wayne M. Wentz . <br /> Page 2 <br /> Octobcr 22, 1997 <br /> �� � e '-o- and M�haafion ee C Ic tio <br /> The site is planned to be developed in two buildings.The fusl•P1�°`�ill include administration. <br /> assembiy,Packaging>and shipping,�s we11 as an employee cafeteria and other amenities��he second <br /> bl boo Fr� <br /> phase is proposed to be a warehousdshipping facility, as follows: � S 2 �3 (�5 3� <br /> '� N � (� <br /> $L111d1I18 1 ' 1�8,���$Q. 13� ''_ I v.l�"IWI { �. (� �d 1 2� <br /> 7 5{� bld� ! ��. � � <br /> �nilrlin 2- 45 000 sa, ft. � � h,�� , w1 r <br /> Tota1223,000 sq, ft. <br /> B�ed Qn inf'orsnauon fmm Solx�on and are�io`ti'afthe ITfi trip 8��on°Odes,the one that best <br /> matches the use of th°site is Genaal Light Industrial. Everett's ordinance��eVCls at the Pra <br /> best available infotmation, and the applicant discussed anticipated employm <br /> ppplication meeting.�� f�e a�wh�enl ihe�rat��app�������fics of lot 2F�� on <br /> ��aployment and the 8 <br /> It is our understanding that the City inte:preu"PM pe�hour"to be the peak hour��n°on that <br /> the site genaates traffic,ratha than the peak hour of the ad��t Sf��e fi t shift,comb ated with <br /> peylc trips for thcsite Was calculated using the ITE PM p <br /> ��p�p��};�ip.generation rate for the numher of employees Dnticipated to be on�lurd shift, Tn the <br /> average and maximum scenarios,the applicane�� �these scenazios Was �alculated using the PM <br /> of the site by creating more shifts, The PM p <br /> poak trip rate for outgoing fust shift� incoming third shift ,�nd the first half of outgoing office <br /> workers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.