Laserfiche WebLink
/ ! <br /> December 8, '!997 <br /> Mr. Tim Tyler <br /> Mr. Steve A�iller <br /> Mr. Tony Lee <br /> CITY OF EVERETT BUILDING DEFARTMENT <br /> Page i'wo <br /> 5. The �sntire building will be equipped with quick response sprinkler heads and the <br /> building is constructed of concrete and steel. <br /> Please review the enclosed information and let me know if we can continue with the design as <br /> shown: <br /> Sincerely, <br /> LANCE MUELLER 8 ASSOCIATES/ARCHITECTS <br /> ��y�.�.�r,./ C��. . <br /> Harold Christensen <br /> Project Architect <br /> HC:Im <br /> encl. (EX-1) <br /> uh+Rz,1Sa«uon.Rr <br />