My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ' <br /> LANCE MUELIER S AR�CIATEB � <br /> A R C H 1 T E C T S • A 1 A <br /> February 3, 1998 � <br /> Mr. Ton Lee �/ ' �J <br /> Associat Engineer '�����(•.�� ,, <br /> CITY OF EVERETT •.� ! , <br /> PUBLIC WORKS �;� '/C+��� <br /> Engineering/Public Services Dept. ��7, " 0� . � <br /> 3200 Cedar Street AQy O f, �998 <br /> Everett, WA 98201 �,r, �L,y <br /> Re: SOLECTRON WASHINGTON, INC. (LMA#97-138) ue`�:e��'� <br /> 6300 Merrill Creek Parkway s <br /> PLAN CHECK#B57524 <br /> Dear Tony: <br /> Thank you for meeting with us to discuss action items from your tenant improvement <br /> comment letter dated January 14, 1998. <br /> I have numbered my responses to coRespond with your original letter. <br /> O¢CUPANCY <br /> y The building will house high pile storage for Commodity Group I-IV, up to 20' high, <br /> � as indicated on the attached plans. I h;ave discussed the requirements of U.F.C. <br /> �� Article 81 with Mr. David Uehaan of the Everett Fire Department and have made <br /> revisions to satisfy the Fire Department in reference to Article 81. <br /> Our intent is to have in place all "built-in" requirements for high pile storage in the <br /> construction of the building and at e� later date (deferred submittal) submit the <br /> specific inventory and racking information for review. <br /> To recap the key items discussed with Mr. Det�aan: <br /> a. The fire sprinkier system will accommodate the higher density required for <br /> high pile storage. <br /> b. The building will have a fire alarm system. <br /> c. The building will have two (2) additional doors for access into areas <br /> containing high pile storage. <br /> d. Smoke vents will be located as shown on the plans. Quantity is based on a <br /> ratio of 1:100 per U.F.C. Atricle 81 and will be UL/FM approved with fusible <br /> link operation and manual release (inside). <br /> The remainder of the building will have drop-out smoke vents as located on <br /> the plans. Quantity is based on a ration of 1:100 per UBC Section 906. <br /> 130 LAKF_SIOE • SIJITE 250 • SEATTLE, WA • BB122 • [2061 39�•2663 • FAX: (QOB) 32B•0364 <br /> ARCHITECTUFE • PLANNING • 6PACE PLANNING • INTEFIORfi <br />
The URL can be used to link to this page
Your browser does not support the video tag.