Laserfiche WebLink
i � � � � <br /> i- <br /> 4. Shared access is required with the adjacent property of Cintas. If an agreement cannot <br /> � be reached with Cin[as to share their driveway, then the proponent's driveway must be <br /> at least 125 feet to the east of Cintas' driveway. <br /> � 5. Walkways must be provided from all three buildings to the public sidewalks. <br /> 6. Any gradine�fill on this site shall be done so as to not impact the surroundiug <br /> ' propecties. <br /> 7. City Strcets are to be kept clear of dirt and debris at all times during construction. <br /> ' Dust suppression and street cleaning must occur as directed by the Public Works <br /> Inspector. <br /> I 8. Perniiu must be obtained for all fill removed from d�e site and placed within the City <br /> limits. <br /> 9. This project must comply with the cuiYent City of Everett Building Code and Sprinkler <br /> Ordinance. <br /> 10. Special charges for connection to the sewer and water systems in accordance with <br /> Ordinance 1998-94 and subsequent revisions are applicable. These charges are based <br /> Ion projected water usage and can be substantial. The Applicant is encouraged to obtain <br /> a copy of the ordinance and determine estimated charges prior to building permit <br /> � application. The actual charges shall be computed by the Public Works Department <br /> per the ordinance in effect at the time and according to the information on the approved <br /> plans at the time of building permit issuance. <br /> I L 1. Lack of comment on the plans submitted with the application does not constitute <br /> approval of these plans. <br /> I 12. The regional detention pond located northeast of this site, on the east fork of Powder <br /> Mill Creek, was sized to receive runoff this site. On-site detention will not be required <br /> for storniwater runoff conveyed to this pond. However, treatment of stormwater <br /> runoff, in accordance with current City standards, will be required for pavement runoff <br /> routed to the regional detention pond. <br /> l3. Previous approvals ior this project site called for routing a small tlow of water into the <br /> native growth areas at the rear of the site to provide a water supply for wildfife in die <br /> arca draining west to the main branch of Powder Mill. Instead of routing a surface <br /> tlow of water to the nativc growth areas, infiltration should be used to mimic natural <br /> � hydrological conditions. InGltration basins and/or roofrop runoff infiltration systems, <br /> I designed and constructed in accordance with City standards, shouid be used to mfiltrate <br /> a quantity of pavement and/or rooftop runoff that mimics the amount of precipitation <br /> thlt namrally infiltrates on the project site. <br /> � <br /> � 14. If infiltration proves infeasible, and a surface discharge is chosen to fulfill previous <br /> SGPA rcquirements, thc quantity of flow and discharge location(s) must be chosen to <br /> � ensure that erosion of namral arcas �vill not occur between the discharge point and il�r. <br /> � main branch of P�• der Mill. Appropriate downstream analysis will be reyuired to <br /> demonstrate that this reyuirement is being met. <br /> I I5. Trea�ment of stormwaiter runoff from paved areas must occur, per City standards, prior <br /> to disch:irge of the stonnwater from the site or to a stream or wedand. Stormwater <br /> I �� <br />