Laserfiche WebLink
, <br /> treaUnent is currently required when 5,000 sf of pavement is created by a project. The <br /> preferred options for stormwater treaunent aze: • <br /> 1) An infiltration basin, if suitable soils exist on the site. <br /> 2) A wetpond. <br /> 3) A constructed wetland. <br /> 16. All stormwater facilities must be designed in accordance with City standards. If none <br /> of the above stormwater treatment options are feasible, in tlie opinion of the City's <br /> Public Works Department, a biofiltration swale, designed and constructed in � <br /> accordance with Ciry standards, will be required to treat stormwater runoff. <br /> 17. Locations of any drainage facilities, and particular(y infiltration basins, near steep <br /> slopes will require detailed geotechnical analysis and design that documenGe and <br /> ensures their safery. <br /> 18. If the future use of the site will result in the potential for accidental spills of chemicals, <br /> including oils ot fuels, to the city's sanitary sewer, an Accidental Spill Prevention Plan <br /> will need to be prepared per the direction of the ciry of Everett's Industrial � <br /> Pretreatment Program. � I <br /> 19. All chemicals or products of a hazardous or toxic nature that may be used or stored on • � <br /> the site must be stored under cover and isolated from the storm drainage system. i <br /> 20. A one-year guarantee is required on the public improvements for an amount not less <br /> than 10% of the cost of construction and shall run for one year from die date of ', <br /> issuance of the first Occupancy Permit for die project. i <br /> 21. A two-year guarantee is required for private retention/detention or other drainage , <br /> treavnendabatement facilities serving areas larger than one acre. ' I <br /> 22. On-site watermain will be staked within an easement to the City. The easement must <br /> be submitted to the City prior to the issuance of permits. 'i � <br /> 23. As-builts of storni sewer, sanitary sewer, and warer systems must be submitted per <br /> City Design and Construction Standards and Specifications for Development. I <br /> 24. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 25. Parking must be per City Zoning Code and Ciry Design and Construction Standards for <br /> Development. For the 161,100 sf of manufacturing/office space and the 42,650 sf of <br /> warehouse space, a minimum of 312 parking stalls are required. A r!minimum of 2%a <br /> of the total number of parking spaces must be accessible spaces. ' <br /> 26. A pcdestriaU circulation system for the site must be approved by the Planning Direcror I <br /> and "Craffic Engineer prior to dic issuancc of any buildiag permits. 1'Valkwsys must � , <br /> allow pedestrians and whccichairs to gain easy access from sidewalks and bus stops to <br /> building entrances through the use of paths which are physically separated from vehicle ' <br /> traffic and maneuvering areas. (See the city's Design and Construction Standards and I i <br /> Specifications Manual and Section 39.165 of the Zoning Code.) ' <br /> 27. Signs on Ihc sitc must comply with Sign Catcgory C. { I <br /> I <br /> IO � � <br />