Laserfiche WebLink
i � � <br /> i <br /> ICITY OF EVERETT <br /> NOTICE OF ISSUANCE OF PLANNED ACTION DETERMINATION (SEPA M29-9� <br /> INotice is hereby given that on July 8, 1997, the City of Everett Planning and Community Developmen� <br /> I Director designated the fol(owing project as a Planned Action pursuant to RCW 43.21C.031(2)(a) and <br /> City of Everett Ordinance No. 2213-97. A SEPA tlueshold determination is not required for this <br /> proposal per 43.21C.031 RCW. <br /> DESCRIPTION OF PROPOSAL: Construction of a 203,750 si n;.��:�facturing, warehouse and <br /> office :acility in three buildings on a 33.4 acre site. Approximately 35,�'�0 cy of structural fill <br /> material will be imported to the site. Approximately 14.5 acres will be maintained in a native growtli <br /> protection easement area. <br /> PROPONENT: Michael Warren <br /> I Quadrant Corporation <br /> 11100 NE 8th Strect, Suite 500 <br /> Bellevue, WA 98009 <br /> I LOCATION: northwest of Merrill Creek Parkway, approximately 1,300 feet nonh of Seaway <br /> Blvd. (Lot 2f of Seaway Center) <br /> ZONIIVG: M-1, OCfice and Industrial Park GENERAL PLAN: 5.4: Office and Industrial Park <br /> �- The City of Everett Planning and Communiry Development Director has deterniined that: <br /> • The project is located within the boundaries of the Southwest Everett Subarea Plan. <br /> I • The zoning designation of the property upon which the project is proposed is consistent with diose <br /> designations analyzed in the Southwest Bverett/Paine Field Subarea Plan and EIS, December 1996. <br /> • The proposed use is consistent with the uses and intensities allowed in the City's development <br /> I regulations and is listed as a use analyzed in the final EIS, Tables 3.1-1 and 3.1-2. <br /> • The project is a use that implements the Subarea Plan; and the projecCs significant environmental <br /> impacts h3ve been adequately addressed in the SW Everett/Paine Field Subarea Plan E1S. <br /> I • The project's significant adverse environmental impacts will be mitigated through the apolication of <br /> the mitigation decision document. These mitigation measures, along with other Ciry requirements <br /> and conditions, constitute sufticient mitigation for the significant environmental impacts asscciared <br /> I with the praposed project. <br /> • The proposed project must comply with all applicable local, state and federal regulations and <br /> development standards. <br /> • The proposed project is not an essential public facility. <br /> 7'his is a courtesy noticc to provide you with infortnation regarding the proposaL Additional <br /> inforn�ation can be revicwed at the Planning and Community Development Department office at 2930 <br /> Netmore, Suite 100. Titerc is no public comment period for this proposal. There is no administrative <br /> appeal provided for this deterniination. If you have any questions about the propasal, pleasc call <br /> M•iry CunRiugham at 257-873I. <br /> f�G..cc.� � . Ro-(.�e� � �C'� <br /> Paul A. Roberts, Director <br /> i Planning/Comnroni[y Dcvelapmcnt <br /> IMailcd:July R, 1997 <br />