Laserfiche WebLink
i. <br /> ' I <br /> Fire alarm systems shall be installed under I� <br /> Departrnent. Electrical inspections and appro al�a ef requ r d prior to calling fo� <br /> acceptance tests, Ca11257-8810 for permit information. � ' � <br /> 35. Portable Fire Protertion - A portable fire extinguisher with a minimum UL rating of <br /> 2A:10-B:C must be provided within 75 feet travel distance on all floors of each <br /> building during construction and prior to occupancy. I i <br /> 36. Fir an c -Fire lanes must be provided as required in Everett Municipal Code 46.44. <br /> Fire lanes must be identified by red curbs with white stenciling stating "NO PAIiKING � <br /> - FIRE LANE" and vertical signs stating "NO PARKING - FIRE LANE - TOW � <br /> AWAY ZONE." Location must be approved by the Fire Marshal. <br /> 37. Premise ldentific�tion - The premises must be clea:ly identified by the conect address <br /> at the street entry. Each building must be clearly identified so as to be visible and <br /> legible from the access road. Each suite, where applicable, must be clearly identified <br /> so as to be visible and legible from the access road. <br /> 38. The Ciry of Everett prohibits outdoor burning. Therefore, outdoor burning for the <br /> purpose of disposing of construction debris or rubbish will not be permitted. j <br /> 39. PREMISE IDENTIFICATION AND ALL REQUIRED FIRE D�PARTMENT I I <br /> ACCESS ROADS AND FIRE HyDRANTS MUST BE IN SERVICE PRIOR TO i I <br /> COMA�NCEMENT OF CONSTRUCTION, i , i I <br /> 40. Fire safery practices during construction must be in compliance with Article 87 of the i <br /> Lnifornt Fire Code. � <br /> 41. Tlte Washington State Clean Air Act requires the use of all known, available, and <br /> reasonable means of controlling air pollution, inciuding dust. Dust generated during � <br /> construction activities can be controlled by wetting those dust sources such as areas of � <br /> exposed soils, washing truck wheels before they leave the site, and installing and i <br /> maintaining gravel construction entrances. Construction vehicle track-out is also a <br /> major dust source. Any evidence of track-out can trigger violations and fines from the ! <br /> Department of Ecology or the Puget Sound Air Pollution Control Agency. � <br /> GENERAL INTORMATION I � <br /> 1. The Snohomish County PUD currendy has sufficient capacity to serve the proposed <br /> devclopment. For further informat;on about the electrical service requirements for this <br /> project, please the District's Everett Office at 425-258-8272 to contact a Customer �� � <br /> Gneineer. <br /> t • <br /> 2. GTE Northwest Incorporated had no comments regarding the proposal. Please contact � ;' <br /> Michael Hupf, Senior Enginecr, at 425-3�6-4052 should you requirc additional - <br /> inforniation. � <br /> � � <br /> i � <br /> t <br /> � <br /> t <br /> ( <br /> �� j� <br />