My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—'—"OCT.23.1997 10�05AM W8H PRCIFIC N0.944 P.2�6 <br /> 1 • � <br /> �- I PACIFIC <br /> 8405 S.W,Nimbus wvetfue <br /> Bawcson,OA 970D8 7120 <br /> � October 22, 1997 <br /> IMr. Wayne M.Wentz ' <br /> ' City of Evesett Public Works Dep c. <br /> ' 3200 Cedar Sueet <br /> Everett,Washington 95201 <br /> � Deaz Wayne, <br /> < <br /> ' This letter is being pcepazed on behalf of Quadrant Corporatian and Solectron, with regard to Lot <br /> 2F in Seaway Cen.ter. Eazlier this year,we preparcd a mitigapon fee calculadon based on a set of <br /> assumptions which the tenant has decided to change. Solectton is in the process of purchasing the <br /> ' property; and is planning a phased development to ultimately include two buildings to be used for <br /> administrarion, assembly,paclaging and shipping of elecuvnic equipment, This letter presents a <br /> revision to thc initial trip generation and azsessment of mitigarion fees. <br /> ISolectron operates as a contractor to various electronics companies, doing parts assembly. Thcy <br /> anticipate a start-up employment of about 337 employees. 'Dcpending on con�act volume and <br /> � schedule needs of those conu�acts,Solacuon plans to staffup or lay off employees to meet demands, <br /> They anricipate an averagc operating level of about 550 employees,in either one or two buildings. <br /> 'Ihe maximum level of employees is anticipated to be 1,200,worlring on 5 sepazate schedulcs,at thc <br /> I ultimate Phase 2 development. At this time,the applicant is unsure when the second building will <br /> be proposed and when employment will be increased over die initial levels, The foAowing table <br /> presents the anticipated initial, average and maximum steffing levels for the faciliry,by shift, <br /> Phase 1 Phese 1-2 Phase 2 <br /> Itdtial Average Maximum <br /> i Fust Shift 167 172 373 <br /> 5:00 un-3:30 pm <br /> ISecond Shift 7G 165 <br /> 6:00 am-6:30 pm <br /> I 1'hird Shift 140 140 310 <br /> 3:45 pm-2:30 am <br /> I Foutth Shift 62 135 <br /> b:CO pm-6:30 a�n <br /> Officc <br /> I 7:00 am-4;00 pm 50 107 <br /> 8:00 am•5:00 pm 50 108 <br /> Total 307• 550 1198 <br /> • 30 addirional empinyees work i 3•day,36-hour weckrnd sltif�6:00 nm-6,30 pm <br /> (503)6:6•OQSSFn�(503)526-0775 Planning•Engineering•Surveying•LandscupeArchitecture � <br />
The URL can be used to link to this page
Your browser does not support the video tag.