Laserfiche WebLink
—'—"OCT.23.1997 10�05AM W8H PRCIFIC N0.944 P.2�6 <br /> 1 • � <br /> �- I PACIFIC <br /> 8405 S.W,Nimbus wvetfue <br /> Bawcson,OA 970D8 7120 <br /> � October 22, 1997 <br /> IMr. Wayne M.Wentz ' <br /> ' City of Evesett Public Works Dep c. <br /> ' 3200 Cedar Sueet <br /> Everett,Washington 95201 <br /> � Deaz Wayne, <br /> < <br /> ' This letter is being pcepazed on behalf of Quadrant Corporatian and Solectron, with regard to Lot <br /> 2F in Seaway Cen.ter. Eazlier this year,we preparcd a mitigapon fee calculadon based on a set of <br /> assumptions which the tenant has decided to change. Solectton is in the process of purchasing the <br /> ' property; and is planning a phased development to ultimately include two buildings to be used for <br /> administrarion, assembly,paclaging and shipping of elecuvnic equipment, This letter presents a <br /> revision to thc initial trip generation and azsessment of mitigarion fees. <br /> ISolectron operates as a contractor to various electronics companies, doing parts assembly. Thcy <br /> anticipate a start-up employment of about 337 employees. 'Dcpending on con�act volume and <br /> � schedule needs of those conu�acts,Solacuon plans to staffup or lay off employees to meet demands, <br /> They anricipate an averagc operating level of about 550 employees,in either one or two buildings. <br /> 'Ihe maximum level of employees is anticipated to be 1,200,worlring on 5 sepazate schedulcs,at thc <br /> I ultimate Phase 2 development. At this time,the applicant is unsure when the second building will <br /> be proposed and when employment will be increased over die initial levels, The foAowing table <br /> presents the anticipated initial, average and maximum steffing levels for the faciliry,by shift, <br /> Phase 1 Phese 1-2 Phase 2 <br /> Itdtial Average Maximum <br /> i Fust Shift 167 172 373 <br /> 5:00 un-3:30 pm <br /> ISecond Shift 7G 165 <br /> 6:00 am-6:30 pm <br /> I 1'hird Shift 140 140 310 <br /> 3:45 pm-2:30 am <br /> I Foutth Shift 62 135 <br /> b:CO pm-6:30 a�n <br /> Officc <br /> I 7:00 am-4;00 pm 50 107 <br /> 8:00 am•5:00 pm 50 108 <br /> Total 307• 550 1198 <br /> • 30 addirional empinyees work i 3•day,36-hour weckrnd sltif�6:00 nm-6,30 pm <br /> (503)6:6•OQSSFn�(503)526-0775 Planning•Engineering•Surveying•LandscupeArchitecture � <br />