My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- -' —OCT.23.1997 16�66fa1'I W&H PHCIFIC N0.944 P.3i6 <br /> f ' <br /> � Mr.WayneM. Wentz <br /> Page 2 <br /> � Octobcr 22, 1997 <br /> � e e ,o � . . • <br /> The site is planned to be developed ia two buildinBs• The firsl•Pl�e will include administrarion, <br /> � assombly,Packaging,and shipping,�weA as an�znployee cafcteria and otha amenities�the second <br /> phase is proposed to be a wazehousdshipping facility, as fallows: <br /> � Building 1 - 178,000 sq. R, <br /> ' di - 4 0 <br /> ' Tota1223,000 sq. R. <br /> Besed on information from Solec�on and areview'ofthe TTE trip g��rion codes,the oae that besc <br /> I matches tae use of the site is Gene�al Light Iadustrial•Bverett's ordinance requires the use of tho <br /> best available infomm�ation, and the applicant diseussed anticipated employmeat levels at the Pre- <br /> Application meetin(r. The following tablo Pres�Ats the ITE trip genen+tion rates based on <br /> ' employment ead the values generatod when the rates ar�aPPl�e�so the specifics of lot 2F. <br /> It is our uader:tanding that the Ciry intetpreu"PM p��hour"to be the peak hour after noon that <br /> [ the site genera;es�affic,ratha than the peak hour of the ad�rat fo�r the fi t shift, comblined with <br /> peak trips for the site Was calculat�using the TTE PM p <br /> I ��pM P�a};�ip.generation rate for the numbtr of employees ancicipatcd to be on�llird shift, In th° <br /> average and maaunum S��nan°9�the applicant plans to break up the volume of tr�c iuto and out <br /> of the site by creating more sbifts. The PM peak for those scenacios was calculated using th�PM <br /> I pealc trip rate for outgoing first shift, incoming wud shift �md the firsc half of outgoing office <br /> workers. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.