My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"-' lOCT.23. 1957 1��97RM WBf� PHCiFIC ��0.944 P.�i6 <br /> I � � , i <br /> C � <br /> 1VIr.Wayne M. Wenu <br /> Page 4 � <br /> ( October 22, 1997 I <br /> � The appiicant believ.s that there aze several factors present that suggest that the initial and aY�iaB� <br /> employment level,rather than cho maximum level should be used as thc basis for mitigation fees: <br /> t ► Tnduslry cycles-The tenant is a contact business that employs labor on an as-needed <br /> basis. If indushy history is an indicator,the elect[onics industry is cyclical. In other <br /> parts of che country, and even Everett to some oxtent,transportation facilities have <br /> Ibeen built to accomtnodate peak employee loads, and when business faces a dowa <br /> � tum, there aze facilities with excess capaciry. Faeiliues in Everett were in this � <br /> ' �ituation when the Everett Boeing plant was at iYs low employment period in the late <br /> 1980's.'The applicant believes it is not reasonablc to base infrastcucture investments <br /> and associated taxes and fees on possible worst c�ce seeaerios wlveh may only l�st i <br /> ' , s month or two out of every couple of years• <br /> ► Tr�ffic is variable-Because af seasonal employee needs,vacations, and increased <br /> l use of altemadve employee schedules (especillly shortened work weeks) there is <br /> fluctuation in travel pattems which can produce u much as 20%variability in naffi� • <br /> I volumes o:�a roads serving employment-intensive azeas over the course of a week. <br /> ► The site wiU need to be aggressive with tranSPortation demand management(TDIv�- <br /> I The site will be required to comply with EveretYs commute hip reduction <br /> requirements, bazed on the aumber of employecs beginning Work in the morning <br /> peak, An aggressive TDM program will reduce the number of trip�gene�'ated As the <br /> employee count increases above the average lcvel, the number o`pa:king stalls <br /> provided, 665,will also provide a self-limiting feanue to individuals driving to the <br /> site. If the max:mum employment scenario is reached, the maximum on-site <br /> I employee count would be about �Solectron has about a lOh%cazpool parti ip t on� <br /> avoid pazldng ovetilow. Glurently, <br /> I The site is calculate�'o cover 825,038 net square feec, or 18.94 acres.Peak period triP Senerarion <br /> rate as calculated above,translates to 18.69 trips per acre for the m��� �►Ployment scenario, <br /> IThis is below the Ciry's threshold of 30 trips per net acre, so no furtr.r analysis is necessary. <br /> $P�ommendation <br /> IThe current application is to devr.lop the initial building and operate it with the curtent employee <br /> base.This�anslates to a mirigation fee of$137,822, as noted in the fee calculation table above.'The <br /> I average operating scenario anticipated for the site is abo�it 550 etnployees, in a shift pattem <br /> ideatified above,resulting in a PM peak�ip generation of 162 and a fee of 5162,972, The applicant <br /> believes it is reasonable to pay the hip mirigation fee based o:�an avaaSe employment level of 550, <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.