My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
BASE FILE
>
6300 MERRILL CREEK PKY BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 9:59:36 AM
Creation date
2/25/2017 10:39:20 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
689
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � <br /> PACIFIC (� �, � � � � � MEMORANDUM <br /> 7035- �td Avee�e N.6 ' ` D <br /> Belkvu�,WA 9800! <br /> r�: �os�u�a::o (VOU 0 51997 <br /> ............................................................. <br /> To: Gordon Witcher CITY OF EVERETT <br /> Bldg. Permit Counter <br /> Company: City of Everett Public Works Date: November 5, 1997 <br /> Address: 3200 Cedar Street Project NumLer: 3-1934-0101 <br /> City/S� ., Everett, WA 98201 Project Name: Solectron Lot 2F of <br /> 5eaway Center <br /> Tel/Fax Ks: 425-257-8800 Regazding: Review Comments <br /> From: Steven Pesce cc: <br /> Phone No.: (206) 828-2840 <br /> Fax No.: (206) 822-5341 <br /> Gordon, this is responses to the review comments received by the City. These comments will address review <br /> comments as well as describe what has been added or changed on each sheet. <br /> C3.1-Grading and Paving Plan: <br /> • Rockery height along the southerly property line has been submitted for review to the planning department. <br /> It was submitteci for review around the middle of October. <br /> • The driveway entrances were called out with standazd detail. 'I'he removal of the Cintas drive was also <br /> called out. Yes, we aze sharing a driveway with Cintas. <br /> • The stormwater outfall was moved to dischazga at the bottom of the regional detention pond. The existing <br /> outlet of the pond was moved during construction to dischazge at the bottom of the regional detention <br /> pond. <br /> • The grading at the north end of the site, near lhe large wetpond, was lowered to match existing grades and <br /> the grades atthe wetpond. <br /> • There is no need for a guazdrail along the east side of the site, because the speed limit for the site should <br /> be less than 15 mph. <br /> C4.1-Storm Plan: <br /> • Some lengths and slopes of the storm system had minor adjustments. There was no change in layout. The <br /> catch basins were double checked for depth to verify type 1 or type 2 catch basins. <br /> • The stormwater outfall was moved to discharge at the bottom of the regional detention pond. The existing <br /> outlet of the pond was moved during construction to dischazge at die bottom of the regional detention <br /> pond. <br /> • After speaking with Jane Zimmerman, [ have provided all the details of the ponds, outlet structures, and <br /> pond walL Shnsaid this would be acceptable for her comments. <br /> Engineering � I.andscape Architecture � Environmental Services <br /> Plnnning � Surveying and Mapping <br /> Washinyton � Orepon � Idaho <br />
The URL can be used to link to this page
Your browser does not support the video tag.