My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6500 MERRILL CREEK PKY BASE FILE 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
6500
>
BASE FILE
>
6500 MERRILL CREEK PKY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 11:03:45 PM
Creation date
2/25/2017 11:02:42 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6500
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECH <br /> CONSULTANTS, INC. <br /> 1325G N.@.20th St.�Northup Way).Suitc 16 ' <br /> Uclleme,WA 9g005 <br /> (Z�6I7A7-5G18 September 28 1gg5 <br /> FAX 747$SG1 � <br /> JN 95292 <br /> The Quadrant Corporation <br /> P•O. Box 130 <br /> Bellevue, Washington 98009 <br /> Attention: George Sherwin <br /> Subject: Geotechnical Engineering Considerations D � � � � " � D <br /> Proposed Manutacturing and Ofiice Building D <br /> Lo ts 2 C a n d 2 D A U G 0 S 1 9 9 6 <br /> Seaway Boulevard and Merrill Creek Parkwa ....... . ..'.......... ...... ............. 1 ;Ilti:`+� "'�•' <br /> Y CIfiY OI� lVEALTT ... � : ; �r�. <br /> Everett, Washington �'�'` ��' <br /> �w/� hrmk Caunter � ,�°'' <br /> Dear Mr. Sherwin: <br /> This letter presents geotechnical engineering considerations for the proposed manufac- <br /> turing and office development in Everett. The preliminary earthwork that has been <br /> completed at the site includes the construction of a large `building pad." Our personnel <br /> made periodic site visits during construction, observing the stripping of surficial organic <br /> soils and perform:iny densiry tests on compacted filis. <br /> ' We were notified of the earthwork on August 15, 1995 and made our first site visit on August <br /> 16, 1995. Before our arrival, we were supplied with a preliminary site plan. The plan <br /> indicates a potential building pad site within about 110 feet of the curb lines of the adjacent <br /> streets (Seaway Boulevard to the south and Merrill Creek Parkway to the east). During our . <br /> first visit, when we observed that strip�,ng and filling work had begun, we were also shown a <br /> topographic map that indicates the final grading for the site. The map also includes the <br /> locations of numerous numbered stakes. The surveyor used these stakes to provide cut <br /> and fill information for the project. We were subsequently provided with a copy of this map, <br /> and we used the stake numbers to locate our density tests, <br /> Lots 2C a��d 2D have approximately 800 feet of shared frontage on their eastern sides along <br /> Merrill Creek Parkway. The widths of these lots are between 720 and 1,046 feet. The <br /> development will spread out along the entire 800 feet of street irontage, but it will only <br /> extend approximately 500 feet west of the eastern property line. Before the earthwork, the <br /> ihe development area's highest point was a knoil with an approximate elevation of 614 feet <br /> on the development area's southwestern side. A low, swale ran through nearly the entire <br /> development area irom the southeast to the northwest, with its lowest point at its north- <br /> ---J:?� <br /> l� <br /> � <br /> � <br /> �r�� -- - - s -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.