„ <n. <br /> • --, <br /> � <br /> JN 95292 <br /> The Quadrant Corporation Page 2 <br /> September 28, 1995 <br /> western corner at an elevation of approximately 596 feet. Cuts and fills of up to about S feet <br /> had been proposed for the development, but deeper fills were needed in some swale areas <br /> �Nhere significant d:pths of organic soils were removed. <br /> All of the fill used was on-site soil generally from the knoll area. This aoil mostly consists of <br /> weathered and unweathered Glacial Tili, which is comprised of gravel, silt, and sand. Some <br /> sand was also enoountered. The site soil is very similar to the soil on other development <br /> sites we have worked on in the near vicinity. Following the stripping of the organic, surficial <br /> soil, the fill was placed in approximately 1-foot lifts and compacted with avibratory roller. <br /> F�ecause the development plan for this project was preliminary, our primary work at the site <br /> was to ensure that the building pad area was adequately stripped, and that the fill was <br /> compacted to at least 95 percent of the laboratory maximum dry density fn �general <br /> accordance with ASTM D-1557 (Modified Proctor). This compaction rate was generally <br /> tested to about 10 feet outside the proposed building pad, although the compaction effort <br /> extended about 15 feet east of the building pad to near the southeastem corner (near Stake <br /> #3717) because a depth of approximately 15 feet of fiil was needed. We performed <br /> -� numerous density tests in accordance with ASTM D•2922 (Nuclear Gauge Method) between <br /> August 16 and September 1, 1995 on the compacted fill during our daily, periodic visits. <br /> Compaction of at least 95 percent was found in our test locations. It appears that the site flll <br /> was adequately comp�cted in the proposed building pad area. Currently, the building pad <br /> is at its proposed final grade, and a large stockpile of the organic soils removed from the <br /> pad area is on the site's eastern edge. <br /> Just outside the southeastern corner of buiiding pad, near Stake #3717, logs and a large <br /> amount of old fill were encountered in what appeazed to be a large swale. The old fill and <br /> logs in and near the building pad were removed, but these materials were left in place <br /> outside the building pad, where we assume a potential pavement area could be. Although <br /> the existing soils in this potential pavement area could possibly be suitabl= for pavement <br /> support, the area should be more closely evaluated by our personnel once a final design <br /> plan is availabie and final earthwork is being performed. <br /> GEOTr^vii"dICAL DESIGN RECOI�V.NM_ENDAT�O dS <br /> Conventional Foundations <br /> The proposed structure can be supported on conventional continuous and spread footings <br /> bearing on the competent, native soils or the compacted fill. We recommend that <br /> continuous and individual spread footings have minimum widths of 24 and 30 inches, <br /> respectively. They should be bottomed at least 12 inches below tiie lowest adjacent finish <br /> ground surface for frost protection. The local building codes should be reviewed to deter- <br /> cro'n:cn covsui:rnrr�ti.wc. <br />