Laserfiche WebLink
l'he City of Evcrctt Planning and Contmunity Development Director has determined that: <br /> • The project is located within the bowidaries of the Southwest Everett Subazea Plan. <br /> • The zoning designation of the property upon which the project is proposed is consistent with <br /> lhose designations analyzed in the Southwest Everett�Paine Field Subarea Plan and EIS, <br /> December 1996. <br /> • The proposed use is consistent with the uses and intensities allowed ir. the City's <br /> devclopment regulations and is listed as a use analyzed in the final E[S, Tables 3.1-1 and 3.1- <br /> � <br /> • The project �a use that implem•�nts the Subarea Plan and the project's significant <br /> environmental impacts have been adequately addressed in the SW Everett/Paine Field <br /> Subarea Plan EIS. <br /> • 1'he project's significant adverse environmental impacts will be mitigated through the <br /> application of the mitigation decision documenL These mitigalion measures, along with <br /> uther City requirements and conditions, const'stute sufficient mitigation for the significant <br /> cnvironmental impacts associated with the proposed project. <br /> . The proposed project must comply with all applicable local, state and federal regulations and <br /> development standards. <br /> • The proposed project is not an essential public facility. <br /> 'rhe project proponent has agreed to comply with the SW Everett Subarea Plan Mitigation <br /> Decision DocumenL The project is hereby designated a PlanneJ Action pvrsuant lo RCW <br /> 43.21 C.031(2)(a) and City of Everett Ordinance No. 2213-97. A SEPA threshold determination <br /> is not requirod (or this proposal per 43.21 C.031 RCW. This determination is dependent upon <br /> compliance �vith the SW 8verett Suba�ea Plan Mitigation decision Document and all local, <br /> state, and fcderal regulations rclated to general environmental protection including, but not <br /> limited to, right-of-way improvement requiremen[s, drainage, etc. This decision was made atter <br /> review of� completeJ environmental checklist and other infonnation on file with the lead <br /> agency. <br /> There is no public comment period provided Cor this detennination. <br /> Responsiblc <br /> Official: Allan Giffen, Director Phune: (425)257-8731 <br /> Title: Planning and Communiry Development Interim Responsible Official <br /> AdJress: 2930 Wetmore Avenue, Suite S-A, Everett, WA 98201 <br /> Date: September 10, 2007 <br /> �, <br /> _\.. ' <br /> i • �--� :_t�'-L � � <br /> 5ignaturc: _�Q�i,L,� i--=��1�6��b,.c�� - - <br /> �:--T `` <br /> "Chere is no administrativc appeal provided for this detemiination!-"--\-� <br /> NO'CF.: 1'his Pla�med Action Determination may be withdraw�n in the event of significant <br /> changes in the proposal, disclosure of new signiticant information, <br /> misrepresentation by the applicant, ar failure to comply with the existing <br /> rcgtdations or the cundilions in the Ntitigation Decision Document. <br /> t <br />