Laserfiche WebLink
� � <br /> �. <br /> PROJECT RESPONSE <br /> TU: CTTY OF E\'ERE1T,b"CE�'E 1RLLER,PE <br /> FROM: GARy'PARKINtiON�1RCHITECIS <br /> SUBJECT: SNBL USA L7D <br /> DATE: 02/19/99 <br /> PAGESe I <br /> PLAN CHEC%Jt 6f178 <br /> The following changcs have bcen madc in response to yau plan checic letter dated 2/17/99. A <br /> copy of your Icttu is attachcd for your refcrcncc Thc items belaw direcdy co:respond ro}'our irems <br /> listed 1-4. <br /> 1. The door schedule has been revised ro reflect 20-minute doocs and frames wherc required. <br /> Please refer to sheet AC40. <br /> 2. A nore has bea�added to the Door plan,sheet A310, that indicates the required automatic <br /> fim-detection system i�icchanical&Electrical plans are being submitted seperarely. <br /> 3. As per our convcrsetio��,we arc in compliance with UBC 7083.1.2.2 as our building is a <br /> non-combustiblc construction. <br /> 4. Sheet A550/Demi12 has been reviscd m indicate that the R-10 perimeta insulation <br /> canrinucs furthcr down thc footing than previously shown. <br /> 'I'wo copics of the plans are rnclosed with this resubmittal as mquested. Your prompt attention to <br /> this rcview has becn very appreciared. Please call if therc are any further questions. 'Ihank you. <br /> 13est Rcgards, <br /> �C'�u.---� �,�.C� . <br /> Connic St. Gcorgc � <br /> 28f2 Colby A�•e. Gvcrett,\��A 98201 (47.5)252-2153 fa_e (425) 742-813 <br /> � � � � o � �� <br /> FED 191999 <br /> CITY Or EVERETT <br /> Permit Services <br />