Laserfiche WebLink
BOARD OF ADJi15TMENT CHECKLIST <br />�, Initial Contact � <br />11. Pre-ApPliwtion Mceting <br />���, Application Date <br />�y, Begin Statt Revtew <br />� L Site Inspection and Photogreph <br />2. Circulate: Dratt Statf Report <br />Proposed Dec. lit required) <br />VI. <br />YII. <br />VIII. <br />IX <br />a. Puhlic Works � <br />b. Fire — <br />c. Police — <br />4, parks — <br />e. Snohomish Co. Health Dist. _ <br />[, Snohomish. Co. PUD _ <br />g. General Telephone __ <br />h, Washington Natural Gas _ <br />(I) Everett — <br />(2) Bellevue -- <br />i. School District <br />(U Evereti <br />(2) Nukilteo — <br />j, Library — <br />k, Building Department _ <br />), Issue Final Statt Recommendation <br />Complete SEPA Review <br />Mall Final Dec to SEPA Register <br />Advertise <br />Mail <br />Public Hearing <br />�. Approved � <br />2, Denied _ <br />Mail Final Action: <br />1. Applicant _ <br />2, Public Works _ <br />7, Building �epartment ,_ <br />W">' � <br />Date <br />+G/O S-' <br />/'/ G P = <br />_'/,� ' 3 <br />�� <br />� �1 �� 3 <br />