Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />... - I__ �J. � <br />. . ! � <br />. � i�1/.' <br />�.- t��f� <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: PmL No. �MECH: Pmt. No. ___�� <br />n ELEC: Pmt. No. � PLBG: PmL No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Siruct. Stab <br />❑ Wood Stove ❑ Rough-In Q�final <br />❑ Masonry ❑ Service ❑ <br />� APPROVAL PARTIAL APPROVAL <br />❑ VIOLATION �CORRECTION REQUIRED <br />L Correclions listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />Was not able!o peAorm inspection. <br />CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A RTIFI OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />ThiE PREMISES PRIOR TO OCCUPANCY. <br />