Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Addre: <br />Contr <br />Ownei <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />�ELEC: Pmt. No. �� ❑ PLBG: PmL No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Siab <br />❑ Wood Stove ❑ Rough-in ❑ Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed beiow MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange tor appointment. <br />❑ Was not able to pertorm inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREIAISES PRIOR TO OCCUPANCY. <br />. • . ��s//�//�//�/��aia <br />