Laserfiche WebLink
pPR-16-03 15:q7 FROM:EVERE7i PLANNING DEPi <br />ChlaCltl�i �jiQapa � <br />l010 Nonh Pulc Drive <br />Evaen, Wachin�to¢ <br />ID:4252578792 <br />� <br />PAGE <br />I-1301 <br />Apn116, 2p03 <br />Pe�e 2 <br />s3ope. The body of the au5cial siope failure was lacated below both of the ex;sriag retaining <br />walls with the headscerp located about 7 tn 10 fbec southwest ofthe concrete raniainQ we11 <br />Hased oa the poor candition and obswed moveme� oFWe mciytia� timbu p�e p.�], � <br />recrnt shallow slope faiiurq end ty� soil and moderete to an,,xe grouodawter seepage oopditiom <br />observed on the slope immodiately below the timber pile waU, it is our opinion that the proposed <br />raPeis piroject should be conr.lered aa emergency aad should he completed as soon u fersible. <br />It is our opinion thet thae conditiaru, if leR u�ated, eould resuit in coacinued slopo <br />de�radation and adversely impacc [he adsting reaideaee loceted about g feet behind the face of <br />the timba pile wall. Failwe of the timber pile wall would po6e a pocemiai saf'ap aud <br />envirunmental risk to the site and edjoinin� down gradierrc propartiey, i� our opinion. <br />We appreciate the opportunity to be of savice to you on this projeez aad would be <br />pleased ta discuss the wntents af this letter or oti�er aspec�a of this projeec with you st yrour <br />wnvenier,cc. If you have any questioag, plcase do npt hesitate to cal1. <br />Rrspecttully submittcd, <br />Zippu Zeman Associates, Inc. <br />� A <br />7nmec P. Gcorgis, <br />Project �rwlcgist <br />� <br />C <br />Thomas 1� Jones, P. E. <br />Associate <br />Cc: Beclry Fauver, City of Evaett PJannin� Departm�m <br />i <br />i <br />I <br />. I �OO�r7lm� a�nriN�� im� <br />18fl0! 77'�Av�nue W.0. 9uia 117 CY�w4 W'��hiqyWoDYC3G <br />ruot <br />��_ 4/Z71os <br />(a33)771 -330� <br />3/3 <br />