Laserfiche WebLink
Ltr. K.Adams (3010-002) <br />October 17, 2003 <br />Page 2 <br />12. Show how the ends of the 6 x 12 D.F. #1 supporting the hot tub are supported to the <br />foundation. <br />13. The window adjacent to the hot tub is required to be safety glass. Show on plans. <br />14. The north elevation dces not match the floor plan. Please clarify <br />15. The second floor plan shows the gazage wa114'-0" from the plane of the second floor, but it <br />scales 24", the south elevation shows 2'-0". Please clarify. <br />16. Please show section at deck ledger at a larger scale. Show flashing and moisture barrier. <br />17. Provide gravity calculations for engineered beams. <br />18. Pmvide beam size and roof framing at new entry. <br />19. Specify roof framing over entry/bedroom/garage. <br />Please prepare a response letter showing where each item in this correction letter is addressed on the <br />plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br />the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />����� <br />Jeff Heilman <br />Development Technician <br />DEDI?INCKMSTR/HEILNAN�QAIP0011 �7�7 W.MUKIL7E0 BLVD� <br />G <br />