My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2201
>
2201 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 2:17:39 PM
Creation date
2/26/2017 3:52:50 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />CLOSED CM WORR ORDERS RSPORT <br />Total Utility Maintenance Management System pVCC Sj�� <br />12/22/1997 Page 1 <br />Date Range O1/09/1989 - 12/22/1997 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101236730248 <br />Item Range :<Blank� - W�1L3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_______________________________________________________________________________ <br />CM WORK ORDER ID: 7101236730248 Title: INSTALL 2201�1i MUKIL:EO BLVD <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />item ID: -- <br />Location ID: -- <br />Program 710 Function 123 Activity 673 <br />Date Completed: 12/02/1997 <br />Overall Craft: <br />Issued: 10/24/1997 <br />Out of Service? No <br />Meter Reading: <br />Downtime: 0 hours <br />Status: HN <br />Labor: <br />Craft ID <br />HEO AAI, <br />SUP1 AGA <br />UL GCR <br />UL GDJ <br />SUP2 HDA <br />TJL HDN <br />EO MJL2 <br />UL NCR <br />HEO OBJ <br />EO SDK <br />MaterialB: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />N/A <br />N/A . <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />PIPE46304347 <br />PIPE46304347 <br />Issued by: HDA Assigned to: AGA <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />---------- <br />ARNOLD, ARTHLTR L <br />AHLES, GREGORY A. <br />GRENZNER, CHRIS R. <br />GOSS, DANNY JAMES <br />HALLSSON, DONALD A. <br />HARRIS, DANIEL N. <br />MITCHELL, JEFFREY L. <br />NIETHAMER, CHARLES R. <br />O'LEARY, BRIAN J. <br />STUART, DARRELL K. <br />Description <br />BRICK CONCRETE 2" X 4" X 8" <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CB 15/FRAME/GRATE (ASSOC) <br />CB15/FRAME/GRATE (ASSOC) <br />TOP COURSE (ASSOC) <br />RISER/CB17 (ASSOC) <br />DUMP FEE (ASSOC) <br />C.D.F. (ASSOC) <br />FRAME/GRATE (SATHER) <br />FRAME/GRATE (SATHER) <br />PIPE 8" PVC SEWER <br />PIPE 8" PVC SEWER <br />Plarned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />18.00 <br />4.00 <br />1.00 <br />1.00 <br />1.00 <br />4.00 <br />16.00 <br />26.00 <br />10.00 <br />26.00 <br />Total Labor Cost: <br />Date <br />il/O1/1997 <br />11/O1/1997 <br />10/20/1997 <br />10/26/1997 <br />11/05/1997 <br />11/OS/1997 <br />11/07/1997 <br />11/07/1997 <br />11/07/1997 <br />11/07/1997 <br />11/O1/1997 <br />11/04/1997 <br /># Used <br />30 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />143 <br />24 <br />Total Material Cost: <br />Cost <br />364.14 <br />89.44 <br />15.78 <br />14.13 <br />25.56 <br />63.12 <br />313.28 <br />410.28 <br />182.40 <br />497.90 <br />1976.03 <br />Cost <br />----- 8.10 <br />147."�6 <br />692.48 <br />692.48 <br />74.75 <br />193.53 <br />30.03 <br />116.96 <br />513.34 <br />�7 i i <br />303.16 <br />50.88 <br />---2894.18 <br />�ea. r6 <br />yo5'.Sz <br />
The URL can be used to link to this page
Your browser does not support the video tag.