Laserfiche WebLink
CLOSED CM PIORR ORDBRS REPORT <br />Total Utility Maintenance Management System <br />12/22/1997 <br />__�_'�__________________________________________________________________ <br />Date Range :O1/09/1989 - 12/22/1997 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101236730248 <br />Item Range :<Blank> - W�7L3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />emaa'v=e=oo=e--e=e=o-o=ocoo'o'=oco=e=ce--ccvo=e=cv-c'e==oce'o==o--c'cvve <br />CM WORK ORDER ID: 7101236730248 (continued) <br />V�hicle.: <br />ID � <br />------- <br />V0010 <br />V2086 <br />V2152 <br />V2230 <br />V2231 <br />V3507 <br />V3508 <br />VJ0002 <br />VJ0004 <br />VJ0021 <br />Description <br />------------------------------ <br />'92 GMC S10 PU <br />91 DODGE PU 1/2 TON <br />87 DODGE W/HOIST <br />91 FORD F800 DUMP 5 YARD <br />90 FORD DUMP 5-YARD <br />88 CASE BACKHOE 4X4 <br />88 CASE BACKHOE 4X4 <br />93 INTERNATIONAL 10 YD <br />'95 CHEV 1-TON <br />'96 FORD DT]MP 10 YARD <br />Hours <br />4.00 <br />4.00 <br />1.00 <br />16.00 <br />26.00 <br />18.00 <br />1.00 <br />1.00 <br />26.00 <br />10.00 <br />TotaZ Vehicle Cost: <br />Cost <br />21.60 <br />21.20 <br />4.80 <br />172.80 <br />270.40 <br />664.20 <br />16.60 <br />21.40 <br />153.40 <br />226.00 <br />1572.40 <br />Page 2 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />INSTALLED 3-CB'S 17 8" PVC, ASPHALT LIP. <br />Total coat for work order 7101236730248: <br />6442.61 <br />�: <br />