My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2401 W MUKILTEO BLVD 2016-01-01 MF Import
>
Address Records
>
W MUKILTEO BLVD
>
2401
>
2401 W MUKILTEO BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 6:29:44 AM
Creation date
2/26/2017 4:01:07 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2401
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 11, 1989 <br />Chris and Barbara Bly <br />2401 Mukilteo Blvd. <br />Everett, WA 98203 <br />CITY OF <br />everett <br />Job Address: 2401 Mukilteo Bl�/d. PUBIICWORN50EPARiMENT <br />]000 CEDAR SiREET <br />Permit Number(s): 19463 (Building), A8341 (Elec.) EyERETT.LVASHINGi04 <br />Date of Permit(s): sezo� <br />3-18-88 <br />A review of our inspection records reveals that the last inspection made at <br />the subject address was on 6-29-88. <br />Section 303(b) of the Uniform Buildinq Code provides that permit3 expire by <br />limitation and become null and void if the building or work authorized h� <br />permit is suspended, after the work is commenced, for a period oP lII0 days. <br />The Code also requires final inspection prior to occupancy for all permits <br />issued, and it is the responsibility of the permit holder to call for the <br />necessary inspections. Because of these time frames, your permit has already <br />expired. <br />However, the City of Everett is at this time extending a one-time qrace <br />':period to holders of recently expired permits. If you wish to recommence <br />work you may renew your permit at no cost for an additional 180 day period <br />by submitting a written request to tliis office. The renewal request must <br />reach us by April 30 1989. If the work has been completed, you may call for <br />final inspection before April 30th. Any corrections required must be <br />completed and final approval obtained before that date. Permits that have <br />been neither finaled nor extended by April 30 19B9 will expire. To renew <br />the work or obtain an inspection will then require the payment of a fee. <br />You may mail or deliver written requests to our office at 3200 Cedar Street, <br />Everett, WA 98201. if you have questions or want to request an inspection, <br />please call us at 259-8810, 8:00 AM to 5:00 PM, Monday through Friday. <br />Sincerely, <br />ALFRED R. THEAL, P.E. <br />Public Works Director <br />By: Marqazet McLeod <br />Building Department <br />cc: Silver Lake Construction <br />SiREETS REALPROPERiY; TRPNSiT h10TOR 6UILDING <br />259�BB20 LIOY t59�BB0] VENILLES 259�B000 <br />259�BB00 059�8802 <br />PUB4C UTIIITIES CONSTRUtl10N ENGINEEPING TaAFFiCENGR! <br />SEFVICES 359�BB00 INSFECTION 159�BB00 SIGtULlAAiHTE4ANLE <br />159�9B00 WattrSewm ^.59�5900 259�9fl00 <br />Orainage <br />
The URL can be used to link to this page
Your browser does not support the video tag.