Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Addre <br />Contre <br />Ownei <br />Date <br />TYPE O�� S� PE2CTION REQUESTED <br />�LDG: Pmt. No. � CLL> ❑ MECH: Pmt. No. _ <br />❑ ELEC: Pmt No. ❑ PLBG: PmL No. _ <br />❑ Temp. Elect. ❑ Framing 0 Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />� Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ R�ugh•In �inal <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />O Was not able to pertorm inspeclion. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />�tn �c c S <br />Inspector <br />Date � � � ^ <br />