Laserfiche WebLink
�t <br /> TRIAD ASSOCIATES <br /> February 20, 1997 <br /> ' Pro�oct Idana9umcn� <br /> Mr. �j0�d�n t1`I��Che� Civil Enginecnny <br /> City of Everett Public Works �1j�, ^��u 'n�, �❑ (� �antl s°�°°Y�^� <br /> 3200 Cedar Street D 'p �1^ 'r � IY/ �y D I and Use Plennm�� <br /> �-- U l'J l� L/ l.�j �po Arehnnr_Lce <br /> Everett WA" 98201 ` �^��° <br /> � Fk6 2 i i997 ��, " ���° <br /> Re: Intracorp Seaway, Tract 1 ,,,, <br /> ..................................................... <br /> Triad Job-No:96-021-30 CITY OF EVERETT <br /> ' Bldg, permR Counter <br /> Dear Gordon; <br /> We are writing to provide a summary of the revisions to the plans previously approved for this <br /> Project. The revis�ons are primarily in regard to the site plan for Building B (the easterly of the 2 <br /> buildings, a.k.a. "Synsor"). The enclosed plan (2 copies, with latest revision date 2/20/97) sliows <br /> the revised grading and utilities for the afl'ected sheet (sheet 8 of 22). A summary of the revisions <br /> to the plans in relation to the Synsor building is listed as follows: <br /> West side <br /> • the 2 parking rows at the south end have been revised to be a drive-in ramp and a retaining <br /> wall has been added (--65' north of south end of building) for transition to dock-high access <br /> • the dock-high access transitions back to drive-in access with another retaining wall (-345' <br /> north of south end of building) <br /> • the parking and the ramp at the north end has been revised to be 4 parking stalls with cross <br /> slope of—5% to minimize the change in elevation near the indicated stairs <br /> • the entry at the north end of the west face has been revised <br /> • a concrete wall dumpster enclosure has been added <br /> South end <br /> • the landscaping strip has been replaced with drive-in access <br /> • parking has been added from —125 east of t6e west face of the building along the south side of <br /> the travelway. The tenant was able to �btain a 20' landscape easement from the adjoining <br /> neighbor to the south ("Sabey"). This revision allows for the back side of the rockery to be <br /> placed on the south property line as shown <br /> • the landscaping island at the west end has been modified to increase the turning radius <br /> clearance for side loading trucks <br /> • the east corner landscaping island has been replaced with a bollard <br /> East side <br /> • as a coitinuation of the parking added along the south of the building, additional parking <br /> (—]00' x 120') has been added in the southeast comer for the site. See "Drainage" below for <br /> a description of the impacts to the storm drainage system/detention as a result of additional <br /> impervious arca <br /> ....�,: � �, '.,..,..,�f:- . -. .:� : ,L�..� . :.. . �.. .; �.� .. Phone . ,..,. .. ,..�,t-. TaIlFree . .�._.. � Pa� . . . <br />