My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MERRILL CREEK PKY 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1920
>
1920 MERRILL CREEK PKY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 1:32:55 PM
Creation date
2/26/2017 7:34:17 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1920
Notes
& 1930
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( SHANNON�WILSON,INC. <br /> wer the structure subgrades, among others. Reter to the "Wet Weather <br /> IFarthwork" secdon for a discussion of these measuces. <br /> ► During construction, it will be necessary to control groundwater seepage and <br /> surtace water runoff with a system of d�ainage ditches and swales. Deeper cut-off <br /> tren�.ies that penetrate into the glaciai soils or belaw planned exc;avadon depths <br /> may be required in some amas to allaw eacavation to proceed in the dry. <br /> � Grading of the site to promote drainage will be necessazy at all times. Surtace <br /> water shoutd not be allowed to 8ow over the east slope under any cincumstance, <br /> unless in a tighdined pipe. <br /> I ► The proposed buildings could be supporte� on conventional spread foodngs and <br /> 1 s la b-on-g�a de floors. The footings should bear in dense W very dense glacial soils <br /> or on compacted structu�al fill placed directly on these glacial soils. We <br /> recommend the use of an allrnvable soil bsaring pressure of 4,000 pounds per <br /> square foot (ps� for simplicity. If desired, select building arcas lacated in <br /> undisturbed, native, till-like soils could be designed for 8,000 psf. <br /> 8.1 Site Devclonment <br /> i � <br /> I In our opinion, development of the site as �lanned should not create a ha7ard w the subject <br /> property provided the recommendations in this report u�e followed. Additionally, it is our <br /> opinion that development witl not adversely affect the east slope or result in a decrease in <br /> Itt,e stability of the slope. Instead, collecting and conuolling surface water upslope, as part <br /> of sitc development, and preventing its flow wer the slope should decrease the rate of future <br /> Islope erosion. Additionally, flattening of select slope areas, as discussed in the following <br /> section, should decrease the risk of local instability. Both measures should at least maintain <br /> Iand most likely increase the current stability of the slope. In fact, if the recommendadons <br /> herein u�e followed, it is our opinion that the proposed construcGon should help W reduce, <br /> but not eliminate, the potential for futurc erosion and themby tend to incmase the stability of <br /> the slope as a whole. <br /> I 8.2 Slope Stability <br /> � The stabiliry of the existing slope atong the eastern mazgin was assessed to establish buitding <br /> setbacks and provide recommendaGons for slope remediadon. This secdon provides a <br /> � summary of the chazacteristics, relsiive stability, and potential mode of tailu�e of each <br /> geologic unit observed on the slope. <br /> I W-6693-01 <br /> � 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.