Laserfiche WebLink
3. GTE Northwest Incorporated will provide service to the site. However, new telephone <br /> cable conswcdon will be required in conjunction with the site development. GTE's <br /> engincering will begin when they are notified of your construction schedules and <br /> telephone requirements. <br /> It will be the developer's responsibility to provide a suitable combination of conduit <br /> and trenching and/or riser conduit to accommodate GTE's network communications <br /> cable within the complex. Provided that an acceptable combination of conduit and/or <br /> trenching is incorporated into the project to accommodate GTE's entrance�cable, there <br /> will be no costs to the developer for GTE's cable. <br /> If a rearcangement of ezisting cables on premises or on the right-of-way is necessary, <br /> appropriate charges will be estimated and GTE's Guaranry of Payment form will be <br /> forwarded to you for your signature. Prior to commencement of GTE's engineering <br /> for such rearrangement, a deposrt will be requ'ved. To insure timely telephone service, <br /> GTE requests ninety (90) days lead time for engineering, procurement, and installadon <br /> of cable and/or GTE's equipment. <br /> Please contact Michael Hupf, Senior Engineer, at 356-4052 should you require <br /> additional informadon. <br /> 13 <br />