Laserfiche WebLink
� <br /> , <br /> Ltr. ivlor�,an S Assoc. (BOd06 006) <br /> July 21, 300=4 <br /> Paec ? <br /> 2) Decks and patios that have a roof or deck above are classified as tloor area per Section <br /> "sU7 and should be induded in the total area of the building. <br /> 3) The following comments apply to buildings#4 S.#12: <br /> i) The rate of increase Por yards on hvo sides is 1.25% per Scction i05.1.1. <br /> ii) The yard to the south may be counted as the entire width of the public way <br /> (yiclding a 50%n bonus for building#d). <br /> iii) Thc maximum allo�vable area for building #12 is then 27,300 sf and it is over <br /> allowable area. <br /> d) Doors from the garage into the adjoining buildines pass throu�h a 3-hour occupancy <br /> separation wall. The minim�m ratin�s should Ue shown as 130 minutes. Sections <br /> 3 l 1.2.2.t & 302.3 <br /> 5) The portions of stairs in Stairw:�.y #2 that are bclow the thrce-hour oci.urancy separation <br /> should either be of steeUcurr.rete construction (with no c�rpeting), or the stair enciosure <br /> should be of three-how•construction (that portion belo�v the 3-huur slah). Se:tions ?02.3, <br /> 311.2.2.l fi 602.�4 <br /> 6) The garage floors shouid drain to approved oil separators or traps dischar�ing to sewcrs in <br /> accordance with the plwnbing code. Scciion 311.23.1 <br /> 7) To complete the shaft and occupancy separation requirements, thc 6'h levcl of building 3 <br /> should be completely separated from the lower le�els of the building by one-hour 6re- <br /> resistivc consmiction. Glazing could be permitted (as shown in the corridor) ho�vever the <br /> openings should be protectcd by minimum one-hour rated doors, fire shutters or approved <br /> material tested as a �v;tll undcr UBC Standard 7-1. <br /> S) The windo�v schedule should note the escape requirements oP windows from sleeping <br /> rooms (below the 4'h story). Note that bedroom window types D 3c E are shown as fized <br /> and type L would not meet the minimum openable size requirements. Section 310.d <br /> 9) Note #9 under Pire Department Rcquirements on Sheet A03 states that buildings 1-9 have <br /> I�'FI'A 13-R sprinklers (attics not sprinklered). This should be revised to state thal all <br /> buildings will be provided with UDC Standard 9-1, NFPA 13 sprinklers (with sprinklered <br /> attics). Section �O6 <br /> 10)Notc#10 under Occupancy and Cons'ruction on Sheet A0.3 states that a manual fire alarm <br /> will be provided. This should be revised to state that an appro��ed auromatic fire detection <br /> system will be provided. City of Everett Ord. 1903-92 § 1, 1992 <br /> �� <br />