My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1525
>
1525 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:04:53 AM
Creation date
2/26/2017 10:03:43 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � � �� <br /> 11. C�i ns�d t�e Du tlsuppress on ende stre�eeclean g mustoccur ats di trected by the <br /> Public Wortcs Inspector. � <br /> 12, The City's Drainape Ordinance was recently updated end chanfles are bsing <br /> mede to the City's Deaipn and Construction Standards for Develo�xnents to rofled <br /> the changes in the ordinance. The chanqes will be effect�ve February 1, 1997. <br /> This project will be required to meet the new standards if applicetion for public <br /> worka perts�its ia made on or after this date. <br /> 13. Qn-site detention ia required per Ciry standarda, unleas there are no naturel <br /> drainage systems beNveen the site and the Snohomish River that wouid be <br /> impacted by the increased rale and volume of stormwater and the downstream <br /> drainage system has the capacity to handle the additional runoff without causing <br /> erosion or flooding. Detention volumes should be calculated usi�g the site <br /> ve�etetive conditions that existed prior to the most recent clearing and grading <br /> activity on the site. <br /> 14. Treatment of stomiweter runoff from peved areas must occur, per Ciry stenderds, <br /> �rior to discharge of the stormwater from the site or to a stream or wetland. <br /> Stor�:�wvater treatment is cuRently required when 10,000 square feet of pavement <br /> is created by a project and three options for stom�weter treatment are presented in <br /> the curcent City standards. The least preferred option is allowed only if the first <br /> oponst�for stormwater treatme t are� n ordertof p eferencWeo�s Department. The <br /> 1. an infiltration basin designed and constructed according to City standards, if <br /> suitable soils exist on iiie site <br /> �. -a�vetpond designed and construeted to City standards <br /> 3. a baffle-type oilNvater separator followed by a vegetated swale, both designed <br /> and constructed according to City standards <br /> Given the presence of consolidated fill on this site, an infiltration basin will not be <br /> feasible. Therefore, a wet�ond will be reauired to treat runoff from the newlY <br /> Qaved areas. <br /> 15. Locations of any drainage facilities near steep slopes may require geotechnical <br /> analysis and design that documents and ensures their safety. <br /> �s� 39.080 of the Zon g Co e a ef Ij wsisposal areas rnust be provided per Section <br /> a. Garbage receptacles, dum�sters, and recycle bins shall be provided in a!I <br /> multiple family, commercial, industrial, and mstitutional developments and <br /> setbacktarea fortcomeelotsu�rWheroe anealleytab seaeo�t�the garbage <br /> receptacles, dumpster, or recycle bin shall be located adjacent to the <br /> alley. <br />
The URL can be used to link to this page
Your browser does not support the video tag.