My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
201 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
201
>
201 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:19:50 AM
Creation date
2/26/2017 10:19:29 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL/� N/O«K5 <br /> �����3 <br /> May 26, 1993 <br /> Brian White <br /> Snohomish County PUD No. 1 <br /> 2320 California Avenue <br /> Everett, Washington 98201 <br /> SUBJECT: PUD SWITCHING STATION AT WEYERHAEUSEC. SITE-STREET <br /> ?MPROVEMENTS <br /> Dear Mr. White: <br /> The original condidon for street improvements noted in the Planning Direc:ror Decision stated <br /> that the existing asphalt pavement behind the curb on the property's Marine View Drive <br /> frontage must be removed and reinstalled with concrete to meet City standazds. <br /> Further revie•v of this project by public works staff has revealed that the switching station <br /> property adjoins a proposed sueet improvement project for the Marine View Drive corridor. <br /> The corridor project plans have the sidewalk and curb realigned [o the north of the existing <br /> sidewalk and curb. <br /> City Ordinance No. 555-78 gives the City the authority to require street improvements in <br /> conjunction with your project. Rather than have the PUD construct their portion of the <br /> comdor improvements we feel it•Nould be more expedient for the PUD to pay a prorated <br /> share of the entire corridor projec.t. The PUD's cost would be based on doing the portion of <br /> the improvements along their frontage (including, curb, gutter, sidewalk, street widen�ng, bike <br /> lane and retaining wall). The �169,000 amount, which is based on our estimate of the <br /> construcdon cost, has been reveiwed by PUD engineering staff. <br /> This amount would fulfill the PUD's obligation for meeting the City's street improvement <br /> ordinance. <br /> If you have any questions regarding Uiis matter please contact our office at 259-8800. <br /> Sincerely, <br /> � � <br /> I.a Crawfo <br /> Assistant Pu lic Works Directur <br /> KO:cglpud/i <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (206) 259-8800 • Fax (206) 259•8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.