Laserfiche WebLink
MEETING MINUTES <br /> CITY OF EVERETT & POWER Engineers, Inc. <br /> S�ibject: Review Comments for City of Everett Permitting <br /> April 8, 1993 <br /> Attendees: <br /> Citv of Everett Snohomish Countv PUD POWER <br /> Kirk Brooks Jim Simpson Richard Childress <br /> Jane Zimmerman Roy Eastman Karl Van Calcar <br /> Chris Zacharia Larry White <br /> Doug Baker <br /> Dave Parker <br /> Lynn Askew <br /> Discussions foliowed City's review comments. <br /> 1. Soil contaminalion levels: POWER will review existing data and prepare a <br /> proposal/work plan to perform further soil sampling to verify Weyefiaeuser's <br /> site clean-up. <br /> 2. Detailed drawings required: <br /> a. Site parking layout — none required <br /> b. Landscaping — none required <br /> c. Utilities <br /> e. Storm drainage — POWER will investigate naturat runoff area to <br /> ensure it is adequate. <br /> f. Temporary construction erosion control —this wiii be done <br /> 3. On-site detention will ba requirsd if, as a result of an alteration of hydrology, <br /> existing �rainage is rot adaquate for naw draina�e. Need to coordinate with <br /> hydrology of wetlands to determine that wetlands need the water. (POWER <br /> cannot say we are using wetlands as detention) It may be necessary to <br /> conduct a study of the existing drainage to the East to verify that it will handle <br /> the extra runoff. <br /> 4. If greater than 10,000 sq. ft. of new asphalt is to be used, the City requires <br /> an oil/water separator. POWER explained that the 10,000 sq. ft does not <br /> include the existing asphalt. By subtracting the square footage of existing <br /> asphalt, the total amount will be less than 10,000 sq. ft. of new material. <br /> Therefore the oil/water separator would not be required. POWER needs to <br /> verify this information . <br /> 5. An erosion control plan is to be approved. <br /> PEI�ILY21-087(rA0187)1750.02gw � <br />