Laserfiche WebLink
WAC 197-11•960 <br /> SEPA ENVIRONMENTAL CHECKLIST _ <br /> AUD NO. 1 OF SNOHOMISH COUNTY <br /> �r�nse nf Ghecklie_t: The State Environmenlal Policy Act (SEPA), chapter 43.21C RCW, <br /> requires all governmental agencies to consider the environmental impacls o( a proposal belore <br /> making decisions. An environmenlal impact statement (EIS) must be prepared for all proposals <br /> with probable significant adverse impacts on the environment. The purpose ot this checklist is <br /> lo provide intormation to help the DISTRICT's Responsibie Oificial and any other agencies wilh <br /> jurisdiction to identify impacls from a proposal (and to reduce or avoid impacts (rom the <br /> proposal, if it can be done) and to heip ihe DISTRICT decide whether an EIS is required. <br /> A. BACKGROUND <br /> 1. Name of proposed project, if applicable: , �� <br /> o� u�.c{,�, k.,,,,,�..,,/,,,«�..�..� � � D�.Gta • <br /> Switching Station <br /> 2. Name of applicant: <br /> Public Utility District No. 1 of Snohomish County <br /> 3. Address and phone number of appiicant and contacl person: <br /> P.O. Box 1107 <br /> Everett, WA. 96206 <br /> Contact Person: Brian White (206) 347-4311 <br /> 4. Date checklist prepared: <br /> November 2, 1992 <br /> 5. Agency requesting checklist: <br /> City of Everett <br /> 6. Proposed timing of scheduie (including phasing, if applicable): <br /> Construction phase is anticipated to begin in early spring of 1993, <br /> and be completed in the tall of 1993. <br /> 7. Do you have any pians for future additions, expansion, or turther activity related to or <br /> connected with this proposai? It yes explain. <br /> The station is being designed with space for the future addition of <br /> two 115kv to 12kv transformer banks. The space is being provided <br /> in the event additional transiormation capacity is needed fn future <br /> years. The t(ming tor the installation of any transformer banks is <br /> not known at this time, and will be based on electrical load growth <br /> in the area. The initiai fence instailaiion will be designed so these <br /> tuture add(tions will not require a relocation oi th� fence or <br /> landscapfng. <br /> 1 <br />