My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
201 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
201
>
201 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:19:50 AM
Creation date
2/26/2017 10:19:29 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WAC 197-11-960 <br /> SEPA ENVIRONMENTAL CHECKLIST <br /> PUD NO. 1 OF SNOHOMISH COUNTY <br /> 8. List any environmental iniormation you know about that has been prepared, or will be <br /> prepared, directly related to this proposal. <br /> Thfs site was contaminated with lime while in the possession of <br /> Weyerhaeuser. The site has now been cleaned by excavating the <br /> contaminated material and repiacing it with clean fill. The clean- <br /> up was an independent effort by We��erhaeuser and reviewed by the <br /> Washington Department of Ecology (DOE). The clean•up was <br /> completed in September,1992. <br /> A Draft and Final Environmental Impact Statement (EIS) were <br /> completed in 1991 for the North County Transmission Project, <br /> which evaluated the transmission system improvements that this <br /> station wiil support. <br /> 9. Do you know whether applications are pending for governmental approvals oi <br /> other proposals direcily affecting ihe property covered by your proposal? II yes <br /> explain. <br /> Approval by the City of Everett for the constructed wetland (by <br /> Weyerhaeuser) at the western edge of the proposed switching <br /> station property. <br /> 10. List any government approvals or permits ihat wiil be needed for your proposal, if <br /> known. <br /> - II-B project review, City ot Everett <br /> • Building and electrical permits, City of Everett (building) <br /> - Engineering permit, City of Everett (site improvements, <br /> drainage, traffic control plan and erosion conirol plan.) <br /> - Utility permit, City of Everett <br /> 11 . Give a brief, complete description of your proposal, including ihe proposed uses and the <br /> size of the project and site. <br /> The North Everett switching station will provide more eflective <br /> distribution of electricity and better capability to isolale and <br /> repair outages. This upgrade does not increase the capacity of the <br /> distribution system. <br /> The proposed switching station site has been an industrial siie for <br /> decades under Weyerhaeuser's management. The site was <br /> contaminated previously with industrial materials, primarily <br /> calcium byproducts. This materiai was recently excavated and <br /> cleaned irom the site. Weyerhaeuser has agreed to provide a clean <br /> site to the District for their use. The contractor compieted the <br /> work in mid September. The Distrfct wfil require verification of <br /> the clean-up prfor to the purchase of the property. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.