My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
534 E MARINE VIEW DR BELMONTE HEIGHTS WHOLE SITE 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
534
>
BELMONTE HEIGHTS WHOLE SITE
>
534 E MARINE VIEW DR BELMONTE HEIGHTS WHOLE SITE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:26:39 AM
Creation date
2/26/2017 10:26:15 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
534
Tenant Name
BELMONTE HEIGHTS WHOLE SITE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service orders,please <br /> contact 1�4vilyn Davis Westlund at(425)356-7512 at least 90 days prior to lhe cequired in-service <br /> date. <br /> Any relocation of existing gas facilities for this development will be at the developer's sole expense, <br /> and requires 90 days minimum notice. Please contact Elaine Babby at (206)224-201 S to coordinate <br /> relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> However, thc existing District facilities in Aie local azea may require upgrading. Cost of any work, <br /> new or upgrade, to existing £acilities that is required to ca ect this proposed development to the <br /> District electrical system sl�all be in accordance with appiwable District policy. For information <br /> about specific electric service requirements, please call thc DistricYs Everett office at(425)258-8272 <br /> to contact a Customer Gngineer. <br /> 3. Veri•r.on Nurthwest will provide service to the site. However, new telephone cable constmetion will <br /> be rcquired i:� conjunction with U�e site devclopn;cnt. Verizon's engineering will begin when t!iey are • <br /> nutified of your construction sclicdules and telephone requirements. <br /> It will be the dcvcloper's responsibility to provide a suitable combination ofconduit and trenching <br /> andlor riscr conduit lo accommodatc Verizon's nctwork communications cable within the complex. <br /> Provided tha! an acccptable combination of conduit ancUor trenching is incorporateJ into il�„ project <br /> to accommudalc Verizon's cntrancc -ablc, thcrc will be no costs to lhe developer for Vcrizon's cable. <br /> If a rcaRviqement of cxisling cables on premises or on the right-of-way is necessary, appropriate <br /> chargcs�vill Uc cstimated and Verizon's Guaranty of Payment fottn will be fonvarded to you for your <br /> signalure. Prior to commencement of Verizon's cngineering for su�h rearrangement, a deposit will be <br /> rcquired. To iusure timcly tclephone service, Verizai rcqucsts ninety (90) days lead time for <br /> cnginecring, procuremcnt, ;uid install�tion of cable ancllor Verizon's equipment. <br /> EXHIBIT #�_ <br /> PAGE 9 pFJ� <br />
The URL can be used to link to this page
Your browser does not support the video tag.