Laserfiche WebLink
• <br /> 919 E. Marine View Drive Apartments #13-4517 <br /> CONDITIONS AND REQUIREMENTS SUMMARY <br /> The site is located within the City of Everett, Washington. The 2010 City of Everett Stormwater <br /> Management Manual is applicable. <br /> Proposed site conditions include 0.530 acres and 0.205 acres of impervious and pervious <br /> areas, respectively. The project adds more than 5,000 square feet of new impervious surface. <br /> In accordance with Figure 2.1 of Volume 1 of the Manual, Minimum Requirements 1 through 9 <br /> apply to this project. <br /> Minimum Requirement#1: Stormwater Site Plan Preparation <br /> A Stormwater Site Plan shall be prepared for City review and approval. <br /> Minimum Requirement#2: Construction Stormwater Pollution Prevention (CSPP) <br /> The project disturbs less than one acre of land. In accordance with Volume 1, Section 2.2 of the <br /> Manual, a small parcel CSPP shall be prepared for City review and approval. <br /> Minimum Requirement#3: Source Control of Pollution <br /> Source control BMP's shall be applied to the project as applicable. <br /> Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls <br /> Existing runoff sheet flows across the east property line and continues to the east. It is <br /> proposed that the natural drainage system be preserved. <br /> The 100-year frequency peak discharge is expected to be less than 0.15 cfs for both the <br /> existing and developed conditions. In accordance with Volume 1, Section 2.2.4 of the Manual, <br /> concentrated runoff may be discharged through a dispersal trench or other dispersal system. A <br /> dispersal system will be proposed for this project. <br /> Minimum Requirement#5: On-site Stormwater Management <br /> On-site stormwater management BMP's shall be provided, where feasible, to reduce the <br /> hydrologic disruption of the developed site. At a minimum, City BMP 12.20 (equivalent to <br /> Ecology T5.13) must be implemented on the site. <br /> Minimum Requirement#6: Runoff Treatment <br /> The total effective, new and/or replaced pollution-generating impervious surface for the project <br /> is approximately 11,500 square feet. In accordance with Section 2.2.6 of Volume 1 of the <br /> Manual, water quality treatment facilities will be required. <br /> Stormwater treatment facilities for the project shall be designed in accordance with the manual. <br /> Minimum Requirement#7: Flow Control <br /> March 25,2014 Prepared by:Group Four, Inc. <br />