Laserfiche WebLink
k <br />� <br />� <br /> E <br />� <br />� � - - <br />� . <br />, <br />�, <br /> ' Page 2 <br /> March 25, 1975 , <br /> 2325 Maple <br /> 5, The plumbing system must comply with all of the grovisions <br /> of the Plumbing Code pertaining tu single family dwellinqs. <br /> (, The 1� inch waste at the kitchen sink and automatic , <br /> washer location shall be replaced with a ZCodeh Waste in <br /> compliance with table 9-1 of the Plumbing <br /> �, The valve at the bathtub has been 3estroyed and shall be <br /> replaced. 1 ed to the ; <br /> g, .The water heater relief valve shall be Pof the Plumbing <br /> outside as set forth in Section 1007 (e) <br /> Code. <br /> 9, The complete plumbing system shall be tested prior to <br /> approval for use and all discrepancies found a1: that <br /> time shall be corrected. <br /> 10. A new meter socket is required. <br /> 11. A new 125 amP service is required with a panel sufficient <br /> to contain circuits . <br /> lZ, Two utility circuits are required in the kitchen. <br /> 13• lets�asesei:�forthn:nhSection 210-25(b)fand1210-2G (a) oft <br /> the Electrical Code. <br /> 14. A new 2c/10�o.g• for the water hearoundedll be ii:ctalled. <br /> 15. All electrical heaters shall be g <br /> The above items are r:ot to be construed to be the only items <br /> required for correction to inAnradditionaldinspeciLioneslalllbef <br /> th� provisions of the Code. <br />� required when the house is lifted off of its founciation and <br /> ready to be moved. All additional uiredetonbeecorrecteday be <br />� found at that time will also be req <br /> The present roof appears to be adequate at this time but it may be <br /> advisable to install a n�w roof covering. <br /> Yours truly <br />��; �;Q..�-d��*'� ' � ' Q. � ��1�.�� <br /> e, <br /> (j-;L�, �ti�c�c ti`7 • , <br />� . � <br /> I Jamie G. Johnson �1 ���� <br /> hInspection Supervisor Trv � <br />� C�� - , <br /> JGJ:eb <br />, . <br /> I <br /> f <br /> I <br />, <br />