Laserfiche WebLink
COMPLIANCE <br />REQUIRED <br />INSPECTION <br />APPROVED <br />IMPORTANT: Please supply Informatlon n the shaded boxes and check the appropriate <br />circles. Disregard topics that don't describe your building or equipment. DO NOI place <br />checks In the two left columns. <br />IAISULA�t�J1►F�PyASOl <br />❑ ❑ 10Waits, Including rim Joists, Shall be insulated without compression to R- _41— ; (Calculations): <br />❑ L�7 <br />grade wails shall be insulated to R--Al A— (Calculations) <br />❑ ❑ExteriorInsulation; it not located on the interior shall be R- , (Calculations). <br />❑ ❑ s shall be insulated without compression to R--ALA (Calculations) <br />TTTT❑ ❑ gnsulation is installed and equivalent to the required wall R-values above. <br />❑ ❑ zs Vapor retarders shall be Installed toward the warm surface as represented below (502.1.6): <br />! Select one option for floors, walls, and appropriate ceilings: <br />Floors: 0 Plywood W/ exterior glue 0 Poly (z 4 Mil) C backed batts <br />I Wails: Poly plastic (a 4 Mil) O Face -stapled, backed batts O PVA paint <br />Ceilings: g Not required where ventilation space averages n12" above insulation. <br />C Face stapled backed batts C Poly plastic (i 4 mil) C PVA paint <br />❑ ❑ QQ Heating system efficiency and sizing requirements shall be met as represented below: <br />❑ Qo xlmum heating system output (150% of design heat load) is... KW 0& 503.2.2) <br />BTU/H 0 <br />❑ ❑ Ci Heating system requirements will be met with following system (S.563.4.1..1): <br />Mfr Model # Max. output IC1N <br />Type <br />WSEC Insulation phase requirements: <br />Inspected by: <br />') �=c�x� <br />❑ ]Crawl space Floors shall be insulated without compression; and with support s 24" O.C. to <br />❑ 0 Non -vaulted, attic ceilings shall be Insulated without Compression to: R- <br />❑ ®Door systems shall meet: U-1 Ee <br />Door types are (1) (2) (3)--- <br />Page 7 <br />f:1 <br />e Calculations J <br />