Laserfiche WebLink
FL.s'2i.i3 52ECI?IC?.':IC:1S .l.`iD i25T OF LQORIC TO 3E SID <br />2217 MCDougall <br />Acdress: <br />. <br />Page 3 of 5 <br />6. Doors e Windows Install new metal screen door at <br />rear dooc of house. Door : aluminum, anodized, owner <br />choice of color, including weatherstripping, threshold, <br />check chain, locking latch and hydraulic closer. <br />Install louvered bifold doors over opening to laundry <br />area, including all necessary hacdware. <br />Replace unsecured window on south wall west end of back <br />porch. New window : single glazed, stopped in with wood <br />stops. <br />Install new insulated caw unit in new window opening on <br />south wall of living room. See house exterioc for <br />location of existing frame on wall. Provide new trim on <br />interior. primed ready for owner's paint. Assume <br />opening has existing header and rough framing. <br />$ "/ �-� <br />7. Bathroom Remodeling Remove existing tub and window <br />seat on east wall of bathroom. Install new end wall for <br />new tub/shower unit from floor to ceiling as shown. <br />Install additional wall section as shown to provide <br />enclosure for laundry area, new header across top of <br />opening. Tear out rotted gypsum wallboard in tub area <br />and replace with 1/2" water resistant type wallboacd. <br />Install standacd wallboard, 1/2" on other new wall areas <br />in bathroom. Tape and spackle new wallboard for smooth <br />wall finish. Paint entire bathroom, two coats, interior <br />semi-gloss enamel latex, owner choice of color. <br />0 <br />Remove flooring and underlayment on bathroom floor.. <br />Install new 3/6" underlayment grade plywood. Install <br />new vinyl sheet goods. $14 per sq. yd. material <br />all�wance,• owner choice of style. Inetall new resilient <br />base at floor including around tub, ownec choice of <br />color. <br />s / 4 a� <br />Plumbing • All new plumbing work : in accordance with <br />the Nat onal Plumbing Code, 1979 edition. <br />Install new one piece fiberglass tub/shower unit in <br />bathroom to replace existing. Repair service vent and <br />waste for tub and shower as necessary. Provide new <br />hardware for tub and shower, Delta or eaual, chrome <br />plated. <br />Relocate aasher to upstairs bathroom includina a11 <br />necessary service and waste plumbing. , <br />Reinstall W.C. after bathroom floor is laid with new wax <br />rina. <br />� � �v - <br />� <br />H <br />� <br />H"~+7 <br />NS <br />� `T, <br />� <br />� <br />�z <br />� <br />�H <br />m <br />�� <br />�N <br />� <br />m <br />. � <br />� <br />� <br />H <br />� <br />� <br />Hn <br />L�7 <br />