Laserfiche WebLink
3E2«R S?�CZ?IC�,�ZOfIS ?.:ID LIST OF WOR�C TO 3E BID <br />Page Z of 5 <br />�,ddress: 2217 �1cDougall <br />Roofing Tear off existina roofing on house comolete <br />to skip sheathing. Remove and stoce gutters until <br />roofing is complete. Replace any rotted starter <br />boards. install new 1/2" CDX plywood over entire roof <br />surface. Cover plywood with 15N asphalt impregnated <br />felt. Install metal eave edge, anodized, throughout. <br />Install new 220M fibecglass composition shingles over <br />entire roof in accordance with mar.ufacturer's <br />installation instructions. Register date of application <br />with the manufacturec. Owner choice of roofing colcr. <br />:teplace flashing between wall and front and cear porch <br />roofs and bay roof on north side. Re-hang gutters after <br />roofing is complete. <br />Masonry Tuckpoint o[ <br />chimney as necessary from <br />metal flashing, ser. into <br />anodized. <br />rebuild existing masonry <br />roof Line up. Install new <br />mortar joints. Flas:iing . <br />s � /� <br />Exterioc Painting ?aint house and <br />Tear off all rotted facia and soffit <br />to match existing Inetall new trim <br />garage exteriors. <br />boards and replace <br />boards under roof <br />rake edge on rear addition. Power <br />including garage. ScraFe all loose <br />from exterior siding and trim on <br />Caulk all openings. -Apply one coat <br />all new and bare wood. Paint entire <br />exterior latex pai.nt, two colors, <br />colocs. Apply two coats deck paint <br />after primer, owner choice o£ color. <br />and <br />wash exterior <br />peeling paint <br />house and garage. <br />oil base primer to <br />house two coats of <br />owner's choice of <br />te new front porch <br />Ventilation install new roof jack vents on upper <br />third of roof, distributed across roof, total <br />ventilation area 3 sq. ft. Install wire screened sof£it <br />vents at each corner of house, total ventilation area 3 <br />sq. ft. trim with quarter-cound for finished <br />appearance. Install baffles as necessary in attic to <br />maintain ventilation clearance to soffit vents. <br />$ ��v <br />5. Front porch Remove steps, railing and deck on front <br />porc� complete. Re-use existing posts. Replace any <br />rotted joists under deck as necessary. Provide slope on <br />joists so deck wi11 drain to west. Install new deck, <br />clear fir T. & G. boards. Contruct new steps down on <br />thcee 2 x 12 stringers. Treads : 2 x 12's. Risers : i <br />x 6's. All step material : pressure treated. Const:uct <br />new railing around porch and down steps. Balusters : 2 <br />x 2 cedar, 6" O.C. Aoply 1 x 4 cedar on each side at <br />top of balusters and instsll ? x 4 cedar on too raii, <br />chamfer ton edges. Install 1-1/2" handrail down both <br />sides of steps, return to railing, heiaht to code. <br />Putty with wood filler ready to oaint. Owner will <br />remove trees at nocth side of porch. Remove existina <br />concrete asbestos board skirting. Install c.a.b. <br />skirtina along foundation under porch if missing. <br />Install new cedar lattice skirting around porch and <br />under steps, attached to solid backing 15" O.C. <br />$ / � <br />� <br />