Laserfiche WebLink
Page 3 of 46 <br />G22. REPORTING AN7'ICIPATED NON-COMPLIANCE ....................................................35 <br />G23. REQUESTS TO BE EXCLUDED FROM COVERAGE UNDER THE PERMIT..........36 <br />G24. APPEAL5 ........................................................................................................................36 <br />G25. SEVERABILITY ...............................................................................................................36 <br />G26. BYPASS PROHIBITED ...................................................................................................36 <br />APPENDIXA — DEFINITIONS ..................................................................................................39 <br />APPENDIXB — ACRONYMS .....................................................................................................46 <br />SU�1�iARY OF PEILrfIT REPORT SUBMITTALS <br />Refer to the Special and General Conditions for additional submittal requirements. <br />Permit Submittal Frequcncy First Submittal Date <br />SS.A <br />SS.B <br />SS.F <br />SS.F <br />G2. <br />G6. <br />G8. <br />G9. <br />G20. <br />G22. <br />High Turbidity/Transparency Phone <br />Reporting <br />Discharge Monitoring Report <br />Noncompliance Notification <br />Noncompliance Notification — Writtcn <br />Report <br />Notice of Change in Authorization <br />Permit Application for Substantive <br />Changes to the Discharge <br />Application for Permit Renewal <br />Notice of Permit Transfer <br />Notice of Planned Changes <br />Reporting Anticipated Non-compliance <br />As Necessary <br />Monthly <br />As necessary <br />As necessary <br />As necessary <br />As necessary <br />1/permit cycic <br />As necessary <br />As necessary <br />As necessary <br />Within 24 hours <br />Within IS days after the <br />applicable monitoring <br />period <br />Immediately <br />Within 5 Days of non- <br />compliance <br />No later than 180 days <br />before espintion <br />SU�L�tARY OF REQUIRED ON SITE DOCUMENTATION <br />SS <br />Document TiUe <br />Letter <br />rmwater General <br />S9, S� Stormwater Pollution Prevention Plan <br />