My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1300
>
1300 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:01:43 PM
Creation date
2/27/2017 6:20:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1300
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16 of 46 <br />Departmeni of Ecology <br />Water Quality Program - Construction Stormwater <br />PO Box 47696 <br />Olympia, Washington 98504-7696 <br />C. Records Retention <br />The Permittee shall retain records of all monitoring information (site log book, sampling <br />results, inspection repoRs/checklists, etc.), Stormwater Pollution Prevention Plan, and <br />any other :locumentation of compliance with pernvt requirements during the life of the <br />construction project and for a minimum of three years following the termination of <br />permit coverage. Such information shall include all calibration and maintenance records, <br />and records of all data used to complete the application for this permit. This period of <br />retention shall be extended during the course of any unresolved litigation regarding the <br />discharge of pollutants by the Permittee or when requested by Ecology. <br />D. Recordins of Results <br />For each measurement or sample taken, the Permittec shall :ecord the following <br />information: <br />1. Datc, place, method, and time of sampling or measurement; <br />2. The individual who perl'ormed the sampling or measurement <br />3. The dates the analyses were performed; <br />4. The individual who performed the analyses; <br />5. The analytical techniques or mediods used; and <br />6. The results of all analyscs. <br />E. Additional Monitorine bv the Permittec <br />If the Pcrmittee monitors any pollutant morc frequenQy than required by this permit using <br />tcst procedures specified by Condition S4 of this permit, the results of this monitoring <br />shall be included in thc caiculation and reporting of the data submitted in the Permittee's <br />DMR. <br />F. Noncomaliancc Notification <br />In the event the Permittec is unable to comply with any of the terms and conditions of <br />this permit which may cause a threat to human health or the environment, the Permittee <br />shall: <br />1. Immediately notify Gcology of the failure to comply. <br />2. Immediately take action to prevent the discharge/pollution, or otherwise stop or <br />correct the noncompliance, and, if applicable, repeat sampling and analysis of any <br />noncompliance immediately and submit the results to Ecology w�thin five (5) days <br />after becoming aware of the violation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.