My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF E\'ERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP NO. 3-0-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />item tor "Preparation of Untreated Roadway", the roadway shali be prepared as specified, but the <br />work shall be included in the contract prices of the other ilems of work. <br />All costs for asphalt tack coat shall be inciuded in the unit contract price per ton of the HMA. <br />"Crack Sealing", by force account. <br />"Crack Sealing" will be paid for by fo�ce account as specified in Section 1-09.6. For the purpose <br />of providing a common proposal for all bidders, the Contracting Agency has entered an amount <br />in tlie proposal to become a part of the total bid by the Contractor. <br />"Pavement Repair Excavation Incl. Haul", per square yard. <br />The unit contract price per square yarcJ for "Pavement Repair Excavation Incl. Haul" shall be full <br />payrnent for all costs incurzed to perfortn the work described in Section 5•04.3(5)E. <br />'Asphslt for Prime CoaP, per ton. <br />The unit contract price per ton for "Asphalt for Prime Coat" shall be full payment for all costs <br />incurred to obtain, provide and install the material in accordance with Section 5•04.3(5)B. <br />"Prime Coat Aggregate", per cubic yard, or per ton. <br />The unit contract price per cubic yard or per ton for "Prime Coat Agg' shall be full pay for <br />fumishing, loading, and hauling aggregate to the place of deposit and spreading the aggregate in <br />the quantities required by the Engineer. . <br />"Asphalt for Fog Seal", per ton. <br />The unit contract price per ton for'Asphalt for Fog Seal" shall be full pay for all costs of material, <br />labor, tools, and equipment necessary for the application of the fog seal as specified. If there is <br />no bid item and a fog seal is required, it shall be applied and the work shall be included in the <br />unit contract prices of the other work items. <br />"Longitudinal Joint Seal", per linear foot. <br />The unit contrect price per linear foot (or "Longitudinal Joint Seal" shall be full payment for all <br />costs incurred to periortn the work described in Section 5•04.3(11). <br />°Planing Bituminous Pavement", per square yarcl. <br />The unit contract price per square yard for "Planing Bituminous PavemenP shall be full payment <br />for all costs incurred to perform the work described in Section 5-04.3(14). <br />"Wate�', per M gallon. <br />Payment for "Wate�' is described in Section 2-07.5. <br />"Anti-Stripping Additive", by calcuiation. <br />"Anti-Stripping Additive" will be paid for in accordance with Section 1-09.6 except lhat no <br />overhead, profit or other costs shall be allowed. Payment shall be made only for the invoice cost <br />of lhe additive. The quantity of asphalt binder shall not be reduced by the quantity of anti- <br />slripping additive used. for the purpose ef providing a common proposal for all bidders, the <br />Contracting Agency has entered an amount in the proposal to become a part of the total bid by <br />the Contractor. <br />Page 28 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.