r <br />PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />5•04.4 Measurement <br />CIP NO. 3-0-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />HMA CI. B PG 58-22 will be measured by the ton in accordance with Section 1-09.2, with no <br />deducGon being made for the weight of asphalt binder, blending sand, mineral filler, or any other <br />component of the HMA. <br />If ihe Contractor elects to remove and replace HMA as allowed by SecGon 5-04.3(8)A, the <br />materiai removed will not be measured. <br />No specific unit of ineasure will apply to the force account item of Crack Sealing. <br />Pavement Repair Excavation Inci. Haul will be measured by the square yard of surface marked <br />prior to excavation. <br />Asphalt for Prime Coat will be measured by the ton in accordance with SecGon 1-09.2. <br />Prime Coat Aggregate will be measured by the cubic yard, truck measure, or by the ton, <br />whichever is designated in the proposal. <br />Asphalt for Fog Seal will be measured by the ton, before dilution, in accordance with Secfion 1- <br />09.2. <br />Longitudinal Joint Seals between the HMA and cement concrete pavement will be measured t <br />the linear foot along the line and slope of the comp�eted joint seal. <br />Planing Bituminous Pavement will be measured by the square yard. <br />Water will be measured by the M gallon as provided in Section 2-07.4. <br />No specific unit of ineasure will apply to the calculated item of Anti-Stripping Additive. <br />No specific unit of ineasure will apply to the calculated item of Job Mix Compliance Price <br />Adjustment. <br />No specific unit of ineasure will apply to the calculated item o( Compaction Price Adjustment. <br />5•04.5 Payment <br />Payment will be made in accordance with Section 1-04.1, for each of the following bid items that are <br />included in the proposal: <br />"HMA CI. B PG 58•22, per ton. <br />"HMA for Pavement Repair CI. B PG 58-22, per ton. <br />The unit contract price per ton (or'HMA CI. B PG 58-22" shall be full compensation for all costs <br />incurred to carry out the requirements of Section 5-04 except for those costs included in other <br />items which are included in this sub•section and which are included in the proposal. <br />"Preparation of Untreated Roadway", per mile. <br />The unit contract price per mile for "Preparation of Unlreated Roadway" shall be full pay for all <br />work described under Section 5•04.3(5)B, with the exception, however, that ali costs involved in <br />patching lhe roadway prior to placement of HMA shall be included in the unit contract price per <br />ton for "HMA CI. _ PG _" which was used tor patching. If the proposal does not include a bid <br />Page 27 of 50 <br />