Laserfiche WebLink
" PORT OF EVERETT <br />W MARINE VIEW DR <br />� IMPROVEMENTS <br />8•02 ROADSIDE RESTORATION <br />Materials <br />Section B-02.2 is amended with the following: <br />�� <br />�_ <br />Root bamer 9-14.6 <br />We�d-control bamer 9•14.8 <br />Rounded riverrock 9-14.8 <br />Mulching material shall be straw that meets the requirements of Section 9-14.4(1) <br />Construction Requirements <br />Section 8•02.3 Construction Requirements is supplemented with the following: <br />CIP N0. 3-0-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />Installer shall be a qualified landscape installer whose work has resulted in successful establishment of <br />exterior plants. <br />Installer's Field Supervision: Require Instalier to maintain an experienced full-time supervisor on <br />Project site when exterior planting is in progress. , <br />Section 8•02.3(4) Topsoil is supplemented with the following: <br />Add the following before the first sentence: <br />Install root barrier—in�landscape. planting beds along acK of curb and ed of sidewalk prior to <br />sprea ing topsoil. � <br />Replace the first sentence with "Topsoil shall be spread eveniy over the specified areas to the depth of <br />12" , <br />Replace in the third sentence "3 inches' with'1 inch". <br />Section 8-02.3(4)A Topsoil Type A is replaced with the (ollowing: <br />( Topsoil: ASTM D 5268, pH range of 5.5 to 7, a minimum of 4 percent organic material content; free of <br />� stones 1 inch or larger in any dimension and other extreneous materials hartnful to plant growlh. <br />� Seclion 8-02.3(5) Planting Area Preparation is supplemented with the following: <br />Replace in lhe thircJ paragraph, last sentence "3 inches" with' ; inch". <br />Section 8-02.3(6) Soil Amendmenlu is amended with the (ollowing: <br />Page 32 of 50 <br />